Site work for a civil project in Manistee, Michigan. Completed plans call for site work for a water / sewer project.

PANGLR-23-P-0000-000879, W911XK24B0005 The U.S. Army Corps of Engineers (USACE), Little Manistee River Sea Lamprey Barrier and Trap project entails construction to improve sea lamprey control in the Little Manistee River, a new auxiliary spillway structure and sea lamprey trap structure is to be constructed at the existing Michigan Department of Natural Resources (MDNR) Fish Spawning Station and Weir in Manistee, MI. Work primarily consists of replacing the concrete spillway structure located north of the Little Manistee Weir. The new auxiliary spillway will consist of steel sheet pile (SSP) and driven wide flange (WF) piles to create a 70 foot long, 6 bay, adjustable height weir. Aluminum stoplogs will be fabricated for each bay in the weir structure. A steel walkway is to be constructed over the weir for stoplog placement and will consist of WF girders ranging between 20 to 26 feet in length, and steel angles, grating, and railing. Welding for the spillway structure shall be performed in accordance with American Welding Society (AWS) D1.1 bridge welding code. Excavation and grading will be performed upstream and downstream of the new spillway weir. The portion of the spillway downstream of the weir will consist of a 6" concrete slab. Riprap placement will be required for scour protection. Estimated Construction Cost: Betw een $1,000,000 and $5,000,000 The Bidder Inquiry System will stop receiving new inquiries ten (10) calendar days prior to the solicitation closing date at 2:00 PM (Eastern) in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary. (a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government for each calendar day of delay until the work is completed or accepted. For the physical construction phase of the work, the liquidated damages amount shall be $1,068.00 per day. For the administrative tasks, including but not limited to closeout submittals, the liquidated damages amount shall be $163.00 per day. (b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$2,857,850.00

Public - Federal

Site Work

44

14

5

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
5
Bidding Soon
157
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

November 5, 2024

img_map_placeholder

To Be Determined, Manistee, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.