BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 6, 2025

Site work and new construction of a mixed-use development in Dillon, Saskatchewan. Design plans call for the construction of a 10,322-square-foot fire / police facility; and for site work for a water / sewer project.

Construction of new modular detachment and storage garage in Dillon, Saskatchewan for the RCMP. The anticipated size of the facility is approximately 899m2 plus a detached storage garage building of approximately 60m2. There is also a requirement for the provision of new sewage lift station. The secured site has been stripped of topsoil and rough graded to provide for positive drainage throughout the property. Two (2) gravel entrances to the site have been established including appropriate culverts as required. The site has been serviced with a 150mm HDPE water main that connects to the municipal system for the community of Dillon. A 50mm HDPE sanitary force main has been brought to the site that connects to an existing gravity system. The detachment site will require a pumped sanitary disposal system that will connect to the existing 50mm force main located on site. Storm water management for the site will be provided via surface drainage. TIMELINE: Project is in design. Engineering consultants have not been released for publication. Tender and construction timing is dependent on funding approvals (timelines unknown). Further update may be available late 2025/2026.

Design

Fire / Police

$6,750,000.00

Public - Federal

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
3
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2026

Project location map

To Be Determined, Dillon, SK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.