Renovation of a transportation facility in Mobile, Alabama. Completed plans call for the renovation of a transportation facility.

This Requisition solicits proposals to replace the roofs on four (4) electrical buildings within the McDuffie Terminal. The project includes but is not limited to the removal and disposal of existing roofs and replacement. Work will be in accordance with: the requirements stated herein; and attached Scope of Work Specifications, reference documents and drawings, Special Conditions and Insurance Requirements; and applicable State of Alabama Laws. The work consists principally of providing bonds, labor, materials, equipment, insurance, meeting access requirements, and supervision necessary for replacing the roof as indicated in the Contract documents. The Project Sites are located at the Alabama State Port Authority McDuffie Coal Terminal facility. The entrance to the facility is located at 1901 Ezra Trice Blvd in Mobile, AL. All Contractors submitting bids are to carefully examine the site of the proposed work by appointment only and thoroughly review the Contract and Project requirements prior to submission of a bid proposal. Each Bidder shall satisfy oneself as to the character, quality, and quantities of work to be performed, and as to the requirements of the proposed contract. The submission of a proposal shall be proof that the bidding Contractor has made such examination and is satisfied as to the conditions to be encountered in performing the work and as to the requirements of the proposed Contract. On bids of $50,000 or more, bidding Contractor must hold a current license from the State Licensing Board for General Contractors, Montgomery, AL, with the classification being (BC) Building Construction, (BC-S) Building Construction - Roofing and Sheet Metal, or (BCU4) Building Construction under Four Stories. The work performed under this contract shall not commence until the Contractor has submitted a Performance Bond, Labor & Material Bond, and acceptable Certificate of Insurance. Performance Bond shall be in an amount equal to 100% of the contract price; Labor & Material Bond equal to 100% of the contract price; and Certificate of Insurance shall be as per the attached requirements and countersigned by a licensed resident agent in the State of Alabama. The Contractor shall comply with all Federal and State laws, local ordinances and regulations, and all orders and decrees of bodies or tribunals having any jurisdiction or authority, which in any manner affect those engaged or employed on the work, or which in any way affect the conduct of the work. Description of Work (continued) The Contractor shall be required to complete all of the work under the Contract within 90 calendar days after receipt of a "Notice to Proceed". The work will have to be scheduled and performed in a manner that will not interfere with operations of the facility or ongoing construction activities operating in the immediate and adjacent areas. Work will start not later than 10 calendar days after receipt of notice to proceed. ASPA intent is that work hours will be during normal day light hours unless indicated otherwise in this Requisition or approved otherwise. The Contractor shall place a competent Superintendent on the Project who shall have experience in the work being performed under the Contract. The assigned Superintendent shall have the responsibility for the day-today operations of the work and shall remain on the Project site while the work under the Contract is being performed. Time is an essential element in the contract. As the prosecution of the work will inconvenience the tenant and interfere with business, it is important that the work be pressed vigorously to completion. Also, the cost to the Alabama State Port Authority of the administration of the contract, supervision, inspection and engineering will be increased as the time occupied in the work is lengthened. For each day that the work remains incomplete after the time specified, $200 per day shall be paid by the Contractor to the Alabama State Port Authority as Liquidated Damages for the loss sustained by the State because of failure of the contractor to complete the work within the specified time(s) indicated in the Scope of Work's Project Phasing description. Any questions regarding the procurement should be directed to Josh Bell, P.E., Project Manager, at phone number (251) 441-7205 or email josh.bell@alports.com. The right is reserved, as the interest of the Alabama State Port Authority may require, to reject any and all bids and to waive informalities in bids received.

Award

Transportation Terminals

$336,960.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
37
Bidding Soon
486
All Active Projects
228
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

March 20, 2023

img_map_placeholder

1901 Ezra Trice Blvd, Mobile, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.