BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Norfolk, Virginia. Working plans call for site work for a water / sewer project.

The purpose of this amendment is to cancel solicitation N40085-23-R-2595 in its entirety NAVFAC Specification Work Order Nos.: 1631222/1631224 N40085-11-C-0020 In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $5,000,000 and $10,000,000. Pre-Propsal Inquiries (PPIs): Offerors who determine that the technical and/or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. PPIs must be submitted in writing on the attached Pre-Proposal Inquiry Form (ATTACHMENT E) to Demetrius Floyd at Demetrius.F.Floyd.civ@us.navy.mil no later than Tuesday, 31 January 2023 at 14:00 PM EST All terms and conditions of N4008518D1156/1157/1158/1159/1160 IDIQ Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not restated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue please contact Demetrius Floyd at (757) 341-0559, or email at Demetrius.F.Floyd.civ@us.navy.mil. NAVFAC Solicitation No.: N40085-23-R-2595 NAVFAC Specification Work Order Nos.: 1631222/1631224 NAVFAC Drawing Nos.: 12,586,861 - 12586872 (11 sheets); 12,619,985 - 12,619,995 (10 sheets) Amendments will be posted directly to https://sam.gov/ under Contract Opportunities. Offerors are responsible for referring back to this site for any amendments to the RFP. The specifications, drawings, and other pertinent attachments are posted on https://sam.gov/ under "Attachments/Links." Title: Design-Build, Replace Sanitary Sewer and Oily Waste/Waste Oil (OWWO) Location of the work: Pier 1, Naval Station Norfolk, Norfolk, Virginia Description of the work: Please see the specifications and drawings included with solicitation. (ATTACHMENT A) Estimated Budget Amount or Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $5,000,000 and $10,000,000. NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction Time for completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984), the Government desires completion of construction within 730 calendar days after award (this includes 15 days for payment and performance bonds submittals). Wage Rate Requirements: Department of Labor (DoL) General Decision Number: VA20210167 12/09/2022 applies to this work (ATTACHMENT B). Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated at the time of award. Liquidated damages: In accordance with FAR Clause 52.211-12 Liquidated damages- Construction, liquidated damages, at the time of award, will be based upon the liquidated damages for the base price, plus any option or combination of options exercised. If an option(s) is exercised within the timeframe allowed after award, the liquidated damages will be increased based upon the liquidated damages for that option. $700.00 per calendar day Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge. Record Shop Drawings: In accordance with FAR 52.236.21, Specifications and Drawings for Construction Alternate I (Apr 1984) record shop drawings and reproducible copies of these record drawings are required. Government Furnished Property: Yes, properties have been identified and terms specified. Basis for Award: The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror. Proposal Acceptance Period: 120 days from receipt of offers. OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE NOT AVAILABLE, NO AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS RESULTING FROM THIS SOLICITATION. Bond Requirements: In accordance with FAR 52.228-1 Bid Guarantee, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the largest amount for which award can be made under the offer submitted, but in no case to exceed $3,000,000. The Offeror shall submit an electronic copy with the price proposal form and a hard copy of your bid bond must be submitted to the address listed in the title above, within three (3) days after the due date and time for receipt of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award. Site Visit: Date and Time: Monday, 23 January 2023, 1130 EST Location: Pier 1, Naval Station Norfolk, Norfolk, Virginia Badging: Contractor personnel that do not have DBIDS access for Naval Station Norfolk, must complete both SECNAV 5512 form and ODP spreadsheet (ATTACHMENTS C and D) and submit to Jacqueline.Harris1.ctr@navy.mil. Complete block 25 of SECNAV 55512 with the following base sponsor information: Jackie Harris, (757) 341-1826. These request must be submitted as soon as possible in order to ensure processing prior to the site visit date. If you are registered with DBIDS or after obtaining your one-day visitor's pass in accordance with Attachments D and E, all participating contractors shall proceed to Pier 1, Naval Station Norfolk, for signin at 11:30am. Pictures are allowable This will be the ONLY Government scheduled site visit, unles the weather conditions permit the site visit. If weather conditions are determined unfavorable the day of the site visit, the date and time will be pushed to Thursday, January 26, 0800 EST. Pre-Propsal Inquiries (PPIs): Offerors who determine that the technical and/or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. PPIs must be submitted in writing on the attached Pre-Proposal Inquiry Form (ATTACHMENT E) to Demetrius Floyd at Demetrius.F.Floyd.civ@us.navy.mil no later than Tuesday, 31 January 2023 at 14:00 PM EST Proposal Due Date: Tuesday, 14 February 2023 no later than 14:00 EST. LATE PROPOSALS WILL NOT BE CONSIDERED. Proposal Delivery Information: PROPOSALS SHALL BE SUBMITTED THROUGH PIEE. The offeror shall submit an electronic copy of the price proposal form and bid bond. A hard copy of each must be submitted within three (3) days to the below address after the due date of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Facsimile transmissions of proposals, acknowledgements of amendments, or modifications to proposals are not authorized. Proposals may be sent via Federal Express (FedEx), United Parcel Service (UPS), or hand-carried to the following address: Mailing Address: ATTN: Demetrius Floyd Naval Facilities Engineering Systems Command Mid-Atlantic Public Works Department Norfolk Facilities Engineering and Acquisition Division Building A81, 2nd Floor 9742 Maryland Ave Norfolk, VA 23511-3095 *PIEE Submissions: Offerors shall also submit electronic proposals (.pdf format) in response to this solicitation. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Electronic proposals shall match the hard copy version of the proposal. In the event of a discrepancy, the electronic copy will govern. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via ATTACHMENT F. Emailed submissions will not be accepted. Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror. PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS WILL NOT BE CONSIDERED. In the event of a discrepancy between the original and copies, the original (electronic) version of the proposal will govern. The offeror is required to submit a complete Price Proposal Form that includes completion of all contract line items numbers (CLINs). All required proposal documents shall be submitted in accordance with FAR 15.208. Importantly, any price information within the technical proposal (non-price proposal) will not be considered. Likewise, any technical/non-price information within the price proposal will not be considered. The price proposal shall be submitted separately, but at the same time as the technical proposal. Offerors may ship both the price proposal and the technical proposal in the same shipping container. In the event of discrepancy, the electronic copy will govern. Furthermore, technical information contained in the price proposal will not be considered. Likewise, price information contained in the technical proposal will not be considered. EVALUATION FACTORS FOR AWARD: The Proposed Task Order will be awarded to the responsible offeror offering the best value to the Government. To make a determination of Best Value, the Government shall evaluate each offeror on the following criteria: Non-Cost/Price Evaluation Factors Factor 1 - Technical Solution Factor 2 - Past Performance The relative order of importance of the non-price evaluation factors is the technical factor (Factor 1 - Technical Solution) is of equal importance to the performance confidence assessment (Factor 2 - Past Performance). The combined non-cost factors are approximately equal to price. Factor 1 -Technical Solution: i) Solicitation Submittal Requirements: a) The Offeror shall provide a "Technical Approach Narrative" describing the technical solution to the project that meets the requirements of the RFP and that demonstrates the Offeror's ability to successfully perform this project in Naval Station Norfolk, Norfolk, VA. Include the following: 1. Overall management and coordination of simultaneous construction activities in regards to multiple disciplines. 2. Approach to successfully completing the project at Pier 1 within the requirements of specification section 01 14 00.00 during the project. 3. Approach to avoid project schedule slippage due to material/equipment procurement and delivery delays. b) Provide a "Labor Force Narrative" describing how the needed skilled labor forces will be provided and maintained throughout the duration of this construction contract for all labor forces at Naval Station, Norfolk, VA. The narrative shall address at a minimum: 1. Securing the needed workforce/skilled work force to work the project. 2. Maintaining the workforce as needed. 3. Design and Construction subcontractors (civil, structural, mechanical, electrical, interiors, and fire protection) and their ability to provide skilled labor. c) Provide an overall CPM schedule showing the timeline of the proposed designs and construction for all three sites as one project. Schedule narrative shall not exceed two (2) double-sided pages (or four (4) single-sided pages). There are no page restrictions on the project schedule reports, but they must be printed on 11"x17" paper. ii) Basis of Evaluation: The Offerors will be evaluated on the extent to which they demonstrate both a clear understanding of the requirements of the RFP and a realistic plan for performing the necessary work within the permitted time period. An offeror whose schedule proposes a realistic and feasible contract duration shorter than the duration permitted by the RFP will be considered more favorably than those that do not. The basis of evaluation will also include the extent to which the Offeror's narratives and CPM schedule demonstrate a realistic plan for handling the complexity of the actual construction work as well as the complexity of working at the pier. The assessment of the Offeror's narrative and CPM schedule will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. An Offeror's "Technical Approach Narrative" that identifies areas of risk in logistics and resource management and provides a comprehensive contingency plan that addresses mitigation of any identified risks with potential solutions may be considered more favorably than those that do not. Factor 2 - Past Performance: i) Solicitation Submittal Requirements: Offerors do not need to provide any information under this factor as the Government will base the evaluation on known past performance on task orders awarded under this Multiple Award Contract (MAC). However, Offerors may provide any information on problems encountered and the corrective actions taken on task orders under this MAC. Offerors may also address any adverse past performance issues under this MAC. Explanations shall not exceed two (2) double-sided pages (or four (4) single- sided pages) in total. ii) Basis of Evaluation: This evaluation focuses on how well the Offeror performed on projects under this Multiple Award Contract. More emphasis will be placed on task orders that are more similar to the RFP. The Government reserves the right to obtain information for use in the evaluation of past performance other than projects performed under this Multiple Award Contract from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor's performance. This evaluation is separate and distinct from the Contracting Officer's responsibility determination. The assessment of the Offeror's past performance will be used as a means of evaluating the Offeror's ability to successfully meet the requirements of the RFP. Offerors lacking past performance information on other task orders under this Multiple Award Contract will not be evaluated favorably or unfavorably in past performance and will receive a Neutral Confidence rating. Price i) Solicitation Submittal Requirements - Offeror shall submit one (1) original, marked "Original", and one (1) copy, with the following: o Cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, Phone Number, and Email Address o Price Proposal Form (ATTACHMENT G) o Acknowledgement of Amendment(s) (as applicable) (ATTACHMENT H) o Copy of Representation and Certifications and proof of registration in System for Award Management (SAM) o Bid Bond o Completed copy of Provision 52.204-24 (Attachment I) ii) Basis of Evaluation - The Government will evaluate price based on the total price proposal including the base price, all options, and all planned modifications. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price: a) Comparison of proposed prices received in response to the RFP. b) Comparison of proposed prices with the Independent Government Cost Estimate (IGCE). c) Comparison of Proposed prices with available historical information. d) Comparison of market survey results. EVALUATION 1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value-the proposal most advantageous to the Government, price and other factors considered. 2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. 3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror. 4. The single technical factor is of equal importance to the performance confidence assessment (past performance) rating; and all non-price factors, when combined, are significantly more important than price. 5. Any proposal found to have a Deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the Deficiency is corrected through discussions. Proposals may be found to have either a Significant Weakness or multiple Weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board's assessment of the identified Weakness(s) and the associated risk to successful contract performance resulting from the Weakness(s). This assessment must provide the rationale for proceeding to award without discussions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

25

9

369

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
27
Bidding Soon
635
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

November 7, 2023

img_map_placeholder

3rd St, Norfolk, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.