Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a military facility in Cherry Point, North Carolina. Completed plans call for site work for a military facility.
Public Works Project No.: 7237694 Title: Repair Hazardous Materials Pad Drain to OWS-22 NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction, $36.5 Million Contract Completion Date: All work shall be completed within 150 calendar days after award. Estimated Cost Range: Between $100,000 and $250,000. Wage Determination: General Decision Number: NC20220065 02/25/2022 Liquidated Damages: $77.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Site Visit: A site visit is scheduled for Tuesday 17 January 2023 at 1000. Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. BONDS TO BE PROVIDED ELECTRONICALLY, SEALS MUST BE VISIBLE. o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation. DoD is amending the DFARS to implement section 848 of the National Defense Authorization act (NDAA) for Fiscal Year (FY) 2022 (Pub. L. 117-81). Section 848 prohibits the use of funds to knowingly procure any products mined, produced, or manufactured wholly or in part by forced labor from the Xinjiang Uyghur Autonomous Region in the People's Republic of China (XUAR) or from an entity that has used labor from within or transferred from XUAR as part of any forced labor programs. In addition, section 848 requires a certification from offerors for DoD contracts stating the offeror has made a good faith effort to determine that forced labor from XUAR was not or will not be used in the performance of a contract. Provision DFARS 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region--Certification, which includes a certification requirement stated below. Clause DFARS 252.225-7060, Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region, which prohibits contractors from providing any products mined, produced, or manufactured wholly or in part by forced labor from XUAR or from an entity that has used labor from within or transferred from XUAR as part of any forced labor programs. Please return an email stating the following for the subject project to be eligible to receive any DoD awards. This provision and clause is effective 30 December 2022. "Certification from YOUR COMPANY NAME, that you have made a good faith effort to determine that forced labor from XUAR was not or will not be used in the performance of a contract resulting from this solicitation, WO 7237694 Repair Hazardous Materials Pad Drain to OWS-22" Proposal Due Date: 08 February 2023, 1200 local time E-Mail Address for Proposals: 1. roicc_chpt_ktr_bids@navy.mil 2. joanna.d.miller2.civ@us.navy.mil 3. ericka.j.bishop.civ@us.navy.mil Requests for Information (RFIs): RFIs must be submitted to the email addresses above. The cut off for RFIs is 28 January 2023 by 0900 in order to process all inquiries by the proposal due date. The specifications and drawings are posted as attachments at WWW.SAM.GOV. The Government intends to evaluate proposals and issue a task order without discussions. Therefore, each initial offer should contain the offeror's best terms from a price standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. Any changes to the Scope of work, Technical Specifications, or Drawings will be issued on a Standard Form (SF) 30. This request does not constitute a notice to proceed nor shall it be considered as a commitment on the part of the Government. Any cost incurred prior to issuance of a task order cannot be reimbursed. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation. Offerors are advised that funding may not become available. If funds are not available, no award will be made as a result of this solicitation. If funding becomes available, the successful offeror will be issued a task order under their contract, as set forth in DFARS 252.216-7006, Ordering (May 2011). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$250,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 8, 2023
March 10, 2023
To Be Determined, Cherry Point, NC
Related To This Project
Cherry Point, NC
Bid Date: Feb 15 2023
Cherry Point, NC
Bid Date: Feb 14 2023
Cherry Point, NC
Bid Date: Feb 22 2023
Cherry Point, NC
Bid Date: Feb 21 2023
Cherry Point, NC
Bid Date: Mar 07 2023
Cherry Point, NC
Bid Date: Mar 02 2023
Cherry Point, NC
Bid Date: Mar 15 2023
Cherry Point, NC
Bid Date: Mar 16 2023
Cherry Point, NC
Bid Date: Jan 11 2023
Cherry Point, NC
Bid Date: Jan 10 2023
Cherry Point, NC
Bid Date: Jun 10 2020
Cherry Point, NC
Bid Date: Jun 18 2020
Cherry Point, NC
Bid Date: Aug 30 2022
Cherry Point, NC
Bid Date: Aug 02 2022
Cherry Point, NC
Bid Date: Aug 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.