BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in West Lebanon, Indiana. Completed plans call for the construction of a educational facility.

Lump Sum Bids will be received for Seeger Memorial HS Boiler Room as shown on the Contract Documents and hereinafter specified and as set forth on the Contractor's Bid Form. Prime Contractors' sealed Bid Packages shall include the following properly executed documents submitted in duplicate: *Tecton Construction, Inc. Bid Proposal Form (spec section 00004) *Bid Guarantee Contractor's Bid Security (spec section 00005) * Indiana State Board of Accounts Form 96 (Part I and II) (spec section 00006) Include financial statement * Affidavit Re: Employment of Unauthorized Aliens (spec section 00010) The project includes the following prime bid packages: Mechanical Contract The work for which bids are requested includes all labor, materials, equipment, and items of materials and services required to provide the proper and complete construction of this project. The work shall be constructed in accordance with this Notice to Bidders, Project Manual, Drawings, and Addenda, as prepared for this project. Bid and Bid Guarantees shall be placed in sealed envelopes and addressed to and shall list the Project Name, the name and address of the bidder and the Bid Package. Separate envelopes shall be provided for each Bid Package. Should any Bidder withdraw his bid or bids within 60 (sixty) days after the time of Bid Opening or if issued a Letter of Intent, withdraw his bid or bids after the issuance of such Letter of Intent, or fail to execute a Form of Agreement if presented, the Owner may declare the Bid Bonds forfeited to the Owner as liquidated damages. The Owner reserves the right to (1) accept any bids by a Letter of Intent within 60 (sixty) days after the time of Bid Opening and a presentation of a Form of Agreement within (30) thirty days from the date of such Letter of Intent (2) at any time reject all bids and (3) waive all informalities, irregularities, or errors in the bidding, provided it is not in violation of the Notice to Bidders or the Statutes of the State of Indiana. Bidders not issued a Letter of Intent will have their Bid Guarantees returned within five (5) days after the issuance of the Letter of Intent. Bid Guarantee: Each bid shall be accompanied by a certified check, cashier's check, money order or a satisfactory bid bond executed by the bidder and an acceptable surety, payable to , in an amount to 5% of the maximum bid. The attorney-in-fact who executes the Bond on behalf of the Surety shall affix to the Bond a certified and current copy of his Power-of-Attorney. Bids shall be executed on the Tecton Proposal Form found in Section 00004 of Bidding Documents as well as on the Indiana State Board of Accounts Form No. 96 (Revised 2013) with NonCollusion Affidavit, with all sections filled in and sworn to as be required by the Statutes of Indiana for all bids. All prices quoted, are to be free of all Federal Excise Taxes and State Sales Tax, and upon request of supplier, tax exemption certificate will be executed by the Owner to the successful bidder to cover all items subject to this tax. Prime Contractors receiving awards shall furnish an approved Performance Bond and Payment Bond for 100% of the contract which shall be in full force and effect for 12 months from the date of acceptance of the work. Bond shall be furnished at the time of written notice to proceed with the work. Questions concerning the contract documents or bidding procedures shall be directed in writing (email) to the following: Carl Robison Tecton Construction Management Inc. 102 North 3rd Street, Suite 201 Lafayette, IN 47901 Email: crobison@tectoncm.com Each Prime Contractor may be asked to submit a completed Contractor's Qualification Statement, AIA Document A305. The Owner reserves the right to reject each bid, and to waive informalities, irregularities, and errors in the bidding to the extent permitted by Law. In addition, the Owner reserves the right to make the decision in the best interest of even if that decision means not accepting the lowest bidder. This includes the right to extend the date and time for receipt of bids. The Construction Manager is not a Bidder for any of the contract packages.

Post-Bid

Educational

$930,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
70
Bidding Soon
652
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

March 9, 2023

img_map_placeholder

1222 IN-263, West Lebanon, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.