Site work and renovation of a water / sewer project in North Haven, Maine. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of 2/15/2023 All bids are rejected. Will rebid at a later date. Under this project includes, but is not limited to, all labor, materials, equipment, and incidentals for the rehabilitation of the Thayer municipal sewer collection system pump station concrete flat top, including general conditions and mobilization, demolition, earthwork (if necessary), backfill and compaction (if necessary); loam and seed; precast concrete; access hatch; painting; and all incidentals as required for a completely rehabilitated pump station structure. The project must be substantially completed within 60 consecutive calendar days and completed within 90 calendar days after the Notice to Proceed. A certified check or bank draft payable to the Owner or a satisfactory Bid Bond executed by the Bidder and Surety Company in an amount equal to five percent (5%) of the Bid shall be submitted with each bid. No bid may be withdrawn for at least 90 days after receipt of bids unless released by Owner. The successful bidder will be required to submit Performance and Payment Bonds, each equal to 100% of the Contractors bid price, as specified by the General Conditions. The successful Bidder will be required to submit proof of liability insurance as specified by the General Conditions, the Supplemental General Conditions, and such construction insurance (e.g., fire extended coverage, workers compensation, public liability and property damage, and all risk builders risk) as is customary and appropriate. Bidders on this work will be required to comply with the Presidents Executive Order No. 11246 and amendments or supplements to that Order. All Bidders must submit a signed statement with their bid as to whether they have previously performed work subject to the Presidents Executive Order No. 11246, or any preceding similar Executive Order. The Contractor must comply with the Department of Labor Regulations relating to Copeland Anti-Kickback Act (18 U.S.C. 874) as supplemented by 29 CFR part 3, Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by 29 CFR part 5, and Occupational Safety and Health Standards (OSHA) (29 CFR part 1910). The Contractor must comply with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act (42 U.S.C. 1857(h)), section 508 of the Clean Water Act (33 U.S.C. 1368), Safe Drinking Water Act, Executive Order 11738, and the Environmental Protection Agency regulations (40 CFR Part 15). The Contractor must comply with all permits, restrictions and conditions, issued for the PROJECT by Federal Cross-cutting Authorities. The Contractor must comply with all Federal Requirements per the Supplementary Conditions. The Contractor must comply with the Disadvantaged Business Enterprises (DBE) SRF special requirements contained in the CWSRF Supplementary Conditions. Failure of the successful Bidder to complete the requirements of this program may result in finding that the Bidder is nonresponsive and therefore not entitled to award of this contract. This contract is expected to be funded in whole or in part by the State of Maine Department of Environmental Protection (DEP) Clean Water State Revolving Loan Fund (CWSRF) program. Neither the State of Maine nor any of its departments, agencies, or employees is or will be a party to this contract. The word agency in the contract documents refers to the DEP and all other involved funding agencies. The Contractor must comply with Davis-Bacon and Davis-Bacon Related Acts as stated in the Supplementary Conditions. All laborers and mechanics employed by the contractor and subcontractors on this project shall not be paid less than the prevailing wage rates contained in the wage determination published in the bidding documents. Any laborers and mechanics not listed in the wage determination shall be paid at least as much as the lowest wage rate for other similar trade classifications already contained in the wage determination published in the bidding documents. In order to be considered as a responsive bidder, each general contractor must be on the Engineers bidding register by purchasing at least one set of bidding documents directly from the Engineers office. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein. The successful Bidder will be required to provide both a Performance and a Payment Bond, each representing 100% of the contract value, at the time of contract execution. The Contractor shall comply with the Use of American Iron and Steel in accordance with Public Law 113-76, Section 436. The law and its requirements and guidance, including certification forms, can be found in the SRF supplementary conditions. The Contractor Compliance Certification included in Attachment E must be completed and submitted with each payment indicating that all required materials have been purchased in compliance with Use of American Iron and Steel Law provisions or an applicable waiver has been obtained. All material submittals must include proof that product meets criteria. Use documentation such as is included in Attachment CWSRF-E. The Owner reserves the right to reject any or all bids, to accept any bid that it deems to be in its best interests, and to waive any irregularities in bidding. The goals for this project are a minimum of 0.64% certified Minority Business Enterprise (MBE) and a minimum of 1.64% certified Women's Business Enterprise (WBE) participation.

Final Planning

Water / Sewer

$1,300,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
9
Bidding Soon
224
All Active Projects
61
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2023

April 4, 2023

img_map_placeholder

To Be Determined, North Haven, ME

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.