EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 18, 2023 at 7:00 PM

Updated January 25, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in New Haven, Indiana. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Owner Office Fort Wayne District / Capital Program Mgmt Contract Type Project Specific Compensation Method Lump Sum Two Step Scoring No Allowable Profit Rate 09.8% Plus Overhead Factor Is Federal Funding Involved Yes # of Firms to Select 1 Project Development Services Four (4) Bridge Deck Overlays and Two (2) Replace Superstructures in Allen and Steuben Counties The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents for the listed project(s) in accordance with INDOTs designated letting schedule. The selected firm shall complete an Engineering Assessment/Alternative Analysis for projects where one is not included in the RFP. The selected firm will also be responsible for: Environmental Document, Permit Applications, Topographic Survey, Design and Plan Development, Geotechnical Engineering, Right-of-Way Plan Development (including Right-of-Way Engineering, Title Research, and Staking), Utility and Railroad Coordination, Construction Phase Services, and other related services as needed. Other services such as Hydraulic Analysis, Pavement Design, Subsurface Utility Exploration (SUE), Archaeological Investigations, Historical/Architectural Investigation, and Wetland Mitigation, may be included later if these work types become necessary. INDOT is expected to perform the Real Estate Acquisition Services (including Right-of-Way Management, Appraising, Review Appraising, Buying and Closing) if these services become necessary. However, if the number of parcels being acquired for a project exceeds 15, then the consultant will be permitted, at INDOTs discretion, to perform the Real Estate Acquisition Services. In the Letters of Interest (LOIs) for this RFP item, interested respondents shall highlight Four (4) Bridge Deck Overlays (Des. 2200786, 2200787, 2200788, 2200789) and Two (2) Replace Superstructures (Des. 2200784, 2200785). The selected firms fee proposal shall be due 45 calendar days after the selection date for this RFP item. These contracts may utilize the INDOT eInvoice application. 2200786 Des 2200786: I-69 Bridge Deck Overlay, SB Bridge over Washington Center Road located 0.62 miles N of SR 3 in Allen Co., RP 311+063 to RP 311+063 // Des 2200787: I-69 Bridge Deck Overlay, NB Bridge over Washington Center Road located 0.62 miles N of SR 3 in Allen Co., RP 311+063 to RP 311+063 $4,002,982.00 Shaw, Kevin 2200788 Des 2200788: I-69 Bridge Deck Overlay, SB Bridge over Spy Run Creek located 0.42 miles S of SR 3 in Allen Co., RP 310+052 to RP 310+052 // Des 2200789: I-69 Bridge Deck Overlay, NB Bridge over Spy Run Creek located 0.42 miles S of SR 3 in Allen Co., RP 310+052 to RP 310+052 $3,064,520.00 Shaw, Kevin 2200784 Des 2200784: I-69 Superstructure Replacement, SB Bridge over Fox Lake Road located 1.80 miles S of US 20 in Steuben Co., RP 346+021 to RP 346+021 // Des 2200785: I-69 Superstructure Replacement, NB Bridge over Fox Lake Road located 1.80 miles S of US 20 in Steuben Co., RP 346+021 to RP 346+021 $4,847,668.00 Shaw, Kevin Prequalification Required: Yes The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Four (4) Bridge Deck Overlays and Two (2) Replace Superstructures

Conceptual

Bridges / Tunnels

$11,915,170.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Erosion and Sedimentation Controls
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
52
Bidding Soon
652
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

img_map_placeholder

Multiple Locations, New Haven, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.