BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in North Palm Beach, Florida. Contact the soliciting agency for additional information.

Sealed qualification proposal envelopes should be marked "RFQ for Professional Planning and Design Services to Develop a Master Plan for the Village of North Palm Beach's Osborne Park and Community Center." The Village shall evaluate the qualification proposals in accordance with the criteria set forth in the RFQ. The Village anticipates an award to the proposer with the proposal determined by the Village to be most advantageous. The Village may conduct interviews and/or require presentations as part of the evaluation process. The Village shall not be liable for any costs incurred by any proposer in connection with its response to this RFQ. The Village reserves the right to reject all RFQ submittals, to waive any formalities, to solicit and re-advertise for new RFQ submittals, or to abandon the project in its entirety. The Master Plan should assess current conditions and existing issues at both parks, analyze future opportunities and constraints, and gain input from the community on the desired uses, facilities, amenities, and services. The Master Plan resulting from this work effort will be used as a guide for future renovation and/or redevelopment of Osborne Park and the Community Center. Specific tasks to include in the Plan include, but are not limited to the following: Scope of Work: 1. Inventory and analyze current park infrastructure, facilities (both indoor and outdoor), and equipment 2. Review plans and other documents as needed to provide background information 3. Identify deficiencies and how they can be corrected, changed or improved 4. Identify potential for development and improved utilization (especially for the Community Center stage, lobby, offices, and front entry area) 5. Identify, describe and implement a comprehensive strategy and methodology for citizen involvement (public engagement) 6. Identify current and future community needs 7. Identify current and future recreation trends 8. Identify future best uses of both parks 9. Evaluate and identify short and long-range vision 10. Identify potential funding sources and strategies 11. Create Draft Plan and recommendations 12. Establish implementation phases and strategy based on priorities 13. Estimate costs of proposed facilities, infrastructure, and/or equipment in each phase 14. Deliver Final Document organized in an easy to read format that can be adopted by the Village Progress Reporting 1. The consultant and the Village's Director of Parks and Recreation shall hold progress meetings as often as necessary, but in no case less than once (1) per month, until the final plan is approved by Village Council for the purpose of progress reporting. 2. The Director of Parks and Recreation shall schedule the meetings, as necessary, at key times during the development of the Master Plan. Action Plan 1. Project kick-off, existing conditions inventory and analysis 2. Review of plans and documents 3. Identification of deficiencies and potentialities 4. Public engagement 5. Development and analysis of future trends and needs 6. Development of vision, design guidelines and implementation strategy 7. Master Plan development Development of Final Plans and Supporting Materials 1. A summary of existing conditions, deficiencies, potentialities, recreation trends, and community needs. 2. Short and long-range visions. 3. Charts, graphs, maps and/or other data as needed to support the plan and its presentation to the appropriate audiences. 4. A Financial Plan. 5. An Action Plan. 6. Plan must present a clear and articulate "road map" for the future of both parks. 7. A color version of the final Master Plan document with drawings for distribution to the public. The report will also be provided in digital format to the Village. 8. A minimum of two (2) meetings with Village Council, one at the time of the presentation of the draft Master Plan, and one at the adoption of the final Master Plan. Preliminary Project Schedule The following tentative schedule is anticipated for selection, contract negotiations and contract award. Contract award will be expected in February/March 2023. The Master Planning associated with this proposal will commence on or about March 2023. The timeline that is projected for the preparation and completion of the Master Plan for the Village of North Palm Beach's Osborne Park and Community Center is six (6) to nine (9) months from the Village Council's approval of the Contract. The method of Contractor Selection has not been determined at this time.

Conceptual

Clubhouse / Community Centers

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
128
Bidding Soon
1,850
All Active Projects
777
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 10, 2023

img_map_placeholder

715 Prosperity Farms Rd, North Palm Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.