BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Buffalo, New York. Conceptual plans call for the renovation of a transportation facility.

The Niagara Frontier Transportation Authority (NFTA) owner and operator of the NFTA-Metro, invites interested Consultants to submit a technical proposal that have the requisite, demonstrable competence and experience in architectural and engineering services for the design, construction monitoring, and design support services during construction for the planned station's partial renovation entitled "LRRT - DL&W Station 2nd Floor Core and Shell Renovation". Qualified firms both singly or in teams must have the requisite, demonstrated competence and experience in and a thorough knowledge of the required architectural and engineering services required for the Project. Qualified firms must demonstrate service competency expertise in concept development, planning, project design, pedestrian bridge design, agency coordination, NYS Building Code Compliance, hazardous materials abatement, procurement, construction administration, design support during construction, construction monitoring, and commissioning The project work requires full architectural and engineering services including civil site plan development. This project shall produce the designs for the shell and core renovation of the 2nd floor of the DL&W Station for future tenant fit out. Outdoors deck work will include the design for public access, permanent restrooms, deck restoration, power distribution and lighting. Shell work will include a new roof, windows, and the restoration of the floor and exterior walls. Core work will include providing capacity of the fire suppression, fire alarm, electrical, lighting, sanitary, natural gas, and water systems necessary to support the proposed development. New work will include the installation of a freight/truck elevator and an elevated pedestrian walkway to the HSBC arena. Proposals are preferred in a .pdf format in files no larger than 10 MB. File names must adhere to the following naming convention: The Consultant shall perform not less than 50% of the work with its own forces. The time of completion for the project is 228 calendar days after receipt of the Notice to Proceed. The established MBE, WBE and SDVOB goals are 7.0%, 7.0%, and 6.0% respectively. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 7% Women Owned Sub-Contracting Goal: 7% Service-Disabled Veteran-Owned Business Contracting Goal: 6% The method of contractor selection has not been determined at this time Awarded vender - Foit-Albert Associates-$ 2890234

Conceptual

Transportation Terminals

$2,890,234.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
132
Bidding Soon
2,467
All Active Projects
1,002
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.