BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Kerrville, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Base Bid - Full traffic and pedestrian signal infrastructure reconstruction at the intersection of Earl Garrett and Water Street. Includes removal of existing signal and pedestrian infrastructure, removal and replacement of pedestrian curb ramps to bring up to ADA compliance, updated pavement markings and markers, and miscellaneous items as noted in construction drawings. Additive Alternate 1 - Remove and replace pedestrian curb ramps at the intersection of Clay Street and Water Street to bring up to ADA compliance. Includes removal and replacement of pavement markings and markers, and miscellaneous items as noted in construction drawings. Additive Alternate 2 - Sidewalk repair at existing tree well along Water Street. Includes removal and replacement of minor area of sidewalk, installation of limestone rock border around tree well, and miscellaneous items as noted in construction drawings. All questions/inquiries regarding this project shall be directed to the Design Engineer through the Online USA website by Wednesday, February 1, 2023 at 5:00 p.m. CST. Questions that result in changes to the specifications will be answered in writing in the form of an addendum. Bid Security in the form of a certified check, cashier's check, or Bid Bond payable to the City of Kerrville, Texas, in the amount of ten percent (10%) of the amount bid as a guarantee that the contract and bond will be entered into within ten (10) days after the award is made. No bids will be accepted after 3:00 p.m. on the date of bid opening. No bidder may withdraw their bid after the scheduled closing time for filing the bids.A Performance/Payment bond in the amount of one hundred percent (100%) of the total contract price will be required. Owner reserves the right to reject any and all Bids, including non-conforming, non-responsive, or conditional Bids. The Owner may also reject the Bid of any Bidder if the Owner believes that it would not be in the best interest of the Owner to make an award to that Bidder. The Owner reserves the right to waive all formalities The deadline to ask questions is 2/01/2023 5:00 PM CST 1. Base Bid - Earl Garrett and Water Street Intersection Reconstruction A. Removal of existing signal infrastructure B. Installation of new signal infrastructure C. Removal and replacement of curb ramps in accordance with ADA criteria D. Additional relevant notes i. Electrical service location to be coordinated with City in advance ii. Confirm location of traffic and pedestrian signal foundations prior to ordering a. Electric lines were unable to tone during survey. Coordinate with KPUB on location iii. Tree removal iv. Historic monument at northeast corner of EG and Water Street. Maintain 5' separation with all infrastructure v. Traffic Control vi. Street Signs on mast arms to be replaced with new E. Removal of existing striping F. Install striping per plan 068710034

Bid Results

Roads / Highways

$308,313.00

Public - City

Paving, Site Work

65

11

6

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
88
Bidding Soon
2,014
All Active Projects
833
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 21, 2023

April 20, 2023

April 12, 2024

img_map_placeholder

Earl Garrett St & Water St, Kerrville, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.