BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a civil project in Rockford, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a water / sewer project; and water / sewer project.

The Collection Systems Operations Facility project consists of building construction, sitework, and landscaping for a new operations facility, including concrete slab-on-grade, steel frame, insulated metal wall panels, erection of previously-bid structural steel package, low slope membrane roofing, plumbing, electrical, mechanical systems, earthwork, storm sewer, sanitary sewer, watermain, PCC and HMA pavement, site lighting, and all other appurtenances as indicated in the Contract documents. Bidder's attention is called to Article 2 - Instructions to Bidders 3.8 requirements for Statement of Qualifications. Bidder must have a permanent business office within forty (40) miles of FRSA's office at 3501 Kishwaukee Street in Rockford, Illinois. All construction associated Project work shall be completed by December 15, 2023. Liquidated damages shall be $300.00 per calendar day beyond that date. For more information, visit the FRSA website . All construction shall be done in accordance with specifications on file with FRSA, including the General Provisions and Technical Specifications for Sanitary Sewer Construction, Four Rivers Sanitation Authority (Current Edition). Each Proposal must be accompanied by the FRSA Bid Bond form with an acceptable Bid Security attached, in the amount of five percent (5%) of the total bid price. This amount is a guarantee that, if the Proposal is accepted, a Contract will be entered into and its performance properly secured. The successful bidder will be required to furnish a satisfactory Performance Bond in the full amount of the Bid or Proposal. No Bid shall be withdrawn without FRSA's consent for a period of sixty (60) days after the scheduled closing time for receipt of bids. FRSA reserves the right to reject any or all bids, or any part thereof, or to accept any bid or any part thereof, or to waive any formalities in any bids, deemed to be in the best interest of FRSA. The Project consists of the construction of a new building with erection of previously bid red-iron steel package (including the fabrication, Storage at fabricators yard until ready for erection and delivery to the project job site). Site Construction and Landscape work to be part of this bid

Award

Water / Sewer

$337,348.00

Public - City

New Construction, Paving, Site Work

67

20

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
110
Bidding Soon
1,993
All Active Projects
851
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2023

April 18, 2023

img_map_placeholder

To Be Determined, Rockford, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.