Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Pueblo, Colorado. Completed plans call for the renovation of a 65,816-square-foot municipal facility.
As of March 20, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. The Colorado State Fair is undergoing renovations to the Agricultural Palace to address accessibility deficiencies and safety issues. Examples of the improvements are the replacement of damaged or uneven concrete flooring throughout the building's interior, replacement of the arena perimeter guardrail, and repairs and/or replacements of various stairway and ramp handrails that are deteriorating or coming loose. In addition, three (3) Bid Add Alternates are identified for work to remove the tennis floor topping in the arena pit, replacement of an exterior stairway to meet minimum code requirements for slope and tread depths, and removal of excess asphalt and concrete flatwork around the SE exterior stair and ramp. The contractor will be responsible to coordinate their construction schedule around existing events at the Agricultural Palace, as well as with construction work occurring in the paved area behind the Agricultural Palace, please refer to Specification for details. BASE Scope of Services The project consists of the following principal design features: INTERIOR Floor repairs to trip hazards throughout the building Perimeter guard rail replacement to meet current code compliance Replacement and/or repairs to stair handrails EXTERIOR Replacement of SE ramp, stairs, and guardrails ALLOWANCES The following must be included in price on SBP-6.13 Bid Form: $75,000 For interior concrete Floor repairs to trip hazards $10,000 For Floor repairs made to the tennis court topping to grind or remove peeling areas, or if ADD ALTERNATE 02 is selected, this will be used for making repairs to the floor after the topping is removed and prior to the sealant BID ADD ALTERNATE 01 - Removal of asphalt and concrete adjacent to the SE exterior stair & ramp, and replacement with concrete. BID ADD ALTERNATE 02 - Removal of the tennis floor topping, repair of existing holes and divots. This item shall include cost to remove and re-install the vehicle access ramp to the arena pit. BID ADD ALTERNATE 03 - Replacement of NE stair & guardrails. Work should include sawcut and removal of a minimum of 3' around the stair base to tie into existing concrete with positive drainage. The Project is anticipated to be Substantially Complete by June 15, 2023. All work started must be completed and cleared by this date to allow for events in the Agricultural Palace. If any work rem Date Email Questions (Clarifications) Due 02/24/2023 Date Email Responses Issued 02/28/2023 Anticipated General Contractor Start 04/03/2023 Anticipated Construction Finish 06/15/2023 Should any Offeror wish to ask a question or make a comment regarding the solicitation, prior to the written inquiries' deadline, Offerors should send a separate email to Kathy.Chang@state.co.us Point of Contact/Clarification/Questions Name: Kathy Chang Agency: Colorado Department of Agriculture Email: kathy.chang@state.co.us Estimated Construction Cost: $360,000.00 Project No: 2021-033M21
Award
Municipal
$432,232.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2023
April 3, 2023
2398 W Summit Ave, Pueblo, CO
Related To This Project
Pueblo, CO
Bid Date: Feb 07 2023
Pueblo, CO
Bid Date: Feb 16 2023
Pueblo, CO
Bid Date: Feb 16 2023
Pueblo, CO
Bid Date: Mar 01 2023
Pueblo, CO
Bid Date: Sep 07 2023
Pueblo, CO
Bid Date: Feb 07 2023
Pueblo, CO
Bid Date: Feb 07 2023
Pueblo, CO
Bid Date: Feb 07 2023
Pueblo, CO
Bid Date: Feb 02 2023
Pueblo, CO
Bid Date: Feb 08 2023
Pueblo, CO
Bid Date: Feb 09 2023
Pueblo, CO
Bid Date: Feb 09 2023
Pueblo, CO
Bid Date: Feb 09 2023
Pueblo, CO
Bid Date: Feb 08 2023
Pueblo, CO
Bid Date: Jan 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.