BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hubert, North Carolina. Completed plans call for site work for a water / sewer project.

For 2023 Hubert Well 2 Repair and Upgrade Bids will be received by the Onslow Water & Sewer Authority to provide all labor, equipment, and materials necessary to remove and evaluate the existing turbine pump, shaft, motor and appurtenances; clean and visually inspect the existing well casing and screens; document well configuration and condition; and implement both pump and motor upgrades. The location of Hubert Well 2 is located at 102 Fodder Drive, Hubert, NC 28539. NC Certified HUB Contractors are encouraged to submit bids for all bidding opportunities at ONWASA. Remove and Inspect Existing Pump Assembly a) Remove the existing motor and pull the pump assembly (intake strainer, impellers, pump column/shaft, etc.) from the well. b) Remove all airline, pressure transducer, and water level access piping from the well. c) After removal of all components, the Contractor shall verify that the existing pump is a Floway Model 12DKF-A- 7. If not, consult with ONWASA for an appropriate course of action. If the pump manufacturer and model is confirmed, continue with the modifications as described in Item #4. d) Inspect all removed components for damage or excessive wear and report any deficiencies to ONWASA. e) All materials removed shall be stored neatly on-site and protected from damage/weather. f) The existing motor and any unused parts shall be delivered to the Hubert Water Treatment Plant, 372 Hubert Boulevard, Hubert, NC 28593. No other well componentsshall be removed from the site by the Contractor without prior approval from ONWASA. . Clean and Inspect Well a) Contractor shall sound well to verify depth. b) Mechanically clean the well casing and screens using nylon brushes; care should be taken to avoid excessive force in cleaning and potential damage to well screens. ) Airlift/bail debris from the well, including removal of accumulated sand/sediment to the overall well depth (estimated 200 feet). d) Monitor water quality during airlift for sand content, Ph levels and turbidity. e) Using video equipment made for this purpose, visually inspect and record the condition of the well casing and screens after cleaning and sediment removal; an ONWASA representative must be present at the site while this work is being performed. f) Prepare a detailed written inspection report to document well conditions and configuration (well diameter, depth of inner/outer casing, screen depth and extent, overall depth, pump installation depth, etc.). g) In the event deficiencies are observed during the inspection, include in the report specific information regarding the type of deficiency, location/extent and a recommended repair method. h) Provide to ONWASA a copy of the video inspection, on suitable storage media (CD or USB flash drive) and two hard copies of the inspection report. ) Contractor will be responsible for removing existing metal covering and insulation on discharge piping to provide access to, then remove the existing 8" flow meter. b) Contractor shall provide and install an 8" propeller-style meter with an analog register and totalizer to read in gallons with a 4-20ma output. Flow meter should meet the specifications of a Water Specialties Propeller flow meter with TR16 Indicator-Totalized-Transmitter or approved equal. c) Contractorshall provide all the necessary gaskets, fittings, flanges, fasteners, hardware, and restraintsto complete the meter installation. d) Contractor will be responsible for the material and labor to replace the insulation and metal covering that was removed during the meter installation process. The repair should be equivalent to the original installation upon completion. e) Contractor will be responsible for the hardware to expand the Remote Terminal Unit, the wiring and SCADA programming of the new flow meter. SCADA programming will provide the ability to view the well flow in gallons per minute on the well pop up screen for Hubert Well 2. Coordination and approval with ONWASA'sIT Department is required for SCADA programming access. f) Contractor shall submit manufacturer cut sheets for all materials for approval by ONWASA prior to ordering.

Award

Water / Sewer

$69,127.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
53
Bidding Soon
596
All Active Projects
276
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 27, 2023

February 27, 2023

May 28, 2023

img_map_placeholder

102 Fodder Dr, Hubert, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.