BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in League City, Texas. Completed plans call for the renovation of a post-secondary education facility.

Questions must be submitted in writing via e-mail to: Matthew Meadows, Project Manager mrmeadow@utmb.edu Michael Maskevich, Purchasing mcmaskev@utmb.edu The last day to submit questions shall be Thursday, January 12, 2023, at 3 pm CST All Respondents interested in submitting a proposal are strongly encouraged to attend a Pre-Proposal Conference to be held via MS TEAMS and the site visit/walk-thru. The conference will begin on Thursday, January 5, 2023, at 10:00 am CST and site inspection will begin on Friday, January 6, 2023, at 10:30 am CST. The Project consists of League City Campus Hospital Central Utility Plant #1 (CUP1): The scope of work includes the relocation of the existing 1 MW trailer-mounted diesel generator; installation of a new structural foundation; and fencing modifications. The scope also includes the installation of a 1600 amp LSIG overcurrent device in the existing switchboard; a new emergency feeder; and the re-use of existing temporary feeder cabling. Central Utility Plant #2 (CUP2): Scope of work includes installation of a 2 MW diesel generator with storm-rated outdoor weather protective housing; skid-mounted 15,000-gallon fuel tank; structural foundation; 3000 amp closed-transition automatic transfer switch with isolation bypass, associated annunciator, and BAS interface communications cabling; interception of existing service lateral raceway system with a new normal, emergency, and load feeders. The scope also includes the installation of a new TNMP pad-mounted utility transformer; and a 45 kVA dry-type transformer. After substantial completion of construction, the overcurrent device settings of the CUP2 electrical distribution system are to be adjusted and verified to match the Coordination Study Reporting furnished by the engineer of record. Note- The 2MW diesel generator is owner furnished/ contractor installed.

Post-Bid

Educational

$3,022,068.00

Public - State/Provincial

Renovation

17

17

40

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
212
Bidding Soon
4,061
All Active Projects
1,656
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.