BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 19, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Akron, Ohio. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Summit County Engineer's Office is proposing to rehabilitate the existing bridge carrying S Main St (CR 50) over Nimisila Creek in the cities of Green and New Franklin, Summit County, Ohio. Improvements include installing new concrete box beams, a concrete deck, and minor approach roadway work. This will be a design-build project. The project is expected to be bid in March 2023 with construction happening in late 2023 or early 2024. Location: On South Main Street, located approximately 0.15-mile north of Comet Rd. PLAN YEAR: 06-01-2023 - 06-01-2024 The method of Contractor Selection has not been Determined at this time.

Final Planning

Bridges / Tunnels

$865,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
143
Bidding Soon
2,326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

Project location map

S Main St, Akron, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.