Published February 28, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Tioga, North Dakota. Completed plans call for site work for a water / sewer project.

Description: The Work is comprised of one (1) Contract: Contract No. 1 - Phase II Pipeline Construction. Individual Bids will be received for the Contract. The Work for the Contract is generally described as follows: Contract No. 1 - Phase II Pipeline Construction: Construction generally consists of furnishing and installing all site work including installation of the following approximate quantities: 2,340 feet 6.0 HDPE water pipeline; 130 feet 2.0-inch and 2,860 feet 6.0-inch POLY bores; one (1) removal of existing air release manhole; one (1) 1.0-inch blow off assemblies; five (5) Gas/Oil/Salt Line verifications; eighteen (18) tie-in to existing; one (1) service reconnection; tracer wire; excavation; backfill; engineered fill; compaction; pressure testing; disinfection, and all associated valves, fittings, and appurtenances; signage; gravel bedding; restoration and seeding. Est. Completion Date: Aug. 30, 2023 All Bids shall be prepared according to the Instructions to Bidders contained within the Project Manual. Each Bid shall be accompanied by a Bid Security in the form of a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of North Dakota, payable to R&T WSD, in a sum equal to five percent (5%) of the full amount of the Bid. A certified check in lieu of a surety company in the amount of 5% of the total project cost will not be accepted. This is to serve as a guarantee that the successful Bidder will enter into a Contract within fifteen (15) days of Notice of Award, in accordance with the terms of the principal's Bid and Contractor's Bond as required by law and regulations and determinations of R&TWSD for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. All Work shall be performed in accordance with the Bidding Documents on file in the Office of R&TWSD where they may be seen and examined. Bidders must be licensed for the full amount of the Bid as required by North Dakota Century Code 43-07-05. Each Bid shall contain a copy of the Contractor's license or certificate of renewal thereof issued by the Secretary of State Contracts shall be awarded on the basis of the low Bid submitted by a responsible and responsive Bidder deemed most favorable to the Owner's interest. The work for each contract must be completed no later than the following: Contract No. 1 Phase II Pipeline Construction: Substantial Completion: August 1, 2023 Final Completion: August 30, 2023 All Bids will be made on the basis of cash payment for such work. After Bid opening, the Owner will return Bid security of all except the three lowest responsible Bidders. When the Contract is awarded, the remaining unsuccessful Bidder's Bonds will be returned. The Owner reserves the right to reject any or all Bids, and further reserves the right to award the Contract in the best interests of the Owner. The Owner reserves the right to hold the three (3) low Bids for a period of sixty (60) days after the date of the Bid opening to complete financial arrangements.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

21

22

2

9

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Stripping and Stockpiling, Soil Stripping and Stockpiling, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Slings

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
3
Bidding Soon
59
All Active Projects
17
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

April 14, 2023

img_map_placeholder

Multiple Locations, Tioga, ND

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

R and T Mountrail CR9 Pipeline Relocation Phase II Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.