BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Glendale, Arizona. Completed plans call for site work for a playground / park / athletic field.

As of May 3, 2023, an construction manager at risk has been selected for the proejct. Construction is expected to take place in november of 2023. The City of Glendale is seeking a qualified construction manager/general contractor to provide design phase assistance and construction services as the Construction Manager at Risk (CMAR) to construct critical components and systems at the Thunderbird reservoir and nearby water distribution infrastructure. The Thunderbird Reservoir is located in the Thunderbird Conservation Park, 22600 North 59th Avenue. The current total project budget is approximately $11M and will be completed in phased guaranteed maximum price (GMP) contracts. All qualified firms interested in providing the required services are invited to submit their qualifications. Responses must comply with the requirements specified in the Request for Qualifications (RFQ). Question Deadline 02/06/2023 at 4:00 PM MT All questions regarding this Request for Qualifications must be submitted in writing prior City of Glendale Engineering Department, 3rd Floor 5850 W. Glendale Avenue Glendale, AZ 85301-2599 Or by E-Mail to : EngineeringDept@glendaleaz.com City Representatives: John Murphy Bill Passmore The City of Glendale owns and operates the Thunderbird Reservoir, which is utilized to store water and maintain hydraulic grade for Pressure Zone 2 in the City's potable water distribution system. The Thunderbird Reservoir was installed in the mid 1980's and several components at the facility are near the end of their useful life. The purpose of this project is to rehabilitate the existing facility by replacing and upgrading several critical components. A structural inspection of the reservoir support columns, floor liner, and roof system was performed in October 2022, which identified required improvements. Additional upgrades are also required to improve water quality. The City has elected to separate the identified improvements into two separate phases. The first phase of this project will focus on the reservoir roof rehabilitation, which must be completed between November 2023 and March 2024 during low demand. The second phase will improve the reservoir's mechanical and electrical systems and water quality, scheduled to be completed by mid-2024. The City is seeking a qualified Construction Manager at Risk (CMAR) to provide pre-construction and construction services. The City will enter into a professional services agreement with an engineering firm for evaluation and design services. The CMAR will work closely with and be an integral part of the project team during all phases of this project. The CMAR begins with the firm in an agency support role for preconstruction services. At some point prior to construction, the CMAR will assume the risk of delivering the project through a guaranteed maximum price (GMP) contract. The CMAR will also be responsible for construction means and methods. The City will also conduct a brief walk-through of the Thunderbird Reservoir site after the pre-submittal conference. Because City staff may not have time to respond to individual inquiries regarding the scope outside of the pre-submittal conference and walk-through, it is recommended that interested firms have a representative attend the pre-submittal conference. Questions pertaining to the RFQ or selection process should be directed in writing to the Engineering Department, City of Glendale, 5850 West Glendale Avenue, Glendale, AZ 85301, or by email to EngineeringDept@glendaleaz.com.

Post-Bid

Playgrounds / Parks / Athletic Fields

$11,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
43
Bidding Soon
1,021
All Active Projects
451
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.