BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2023 at 7:00 PM

Updated April 24, 2025

Site work for a civil project in Minden, Nevada. Completed plans call for site work for a water / sewer project.

Site Directions: Approximately 250-feet from the Genoa Canyon Trailhead, Carson St, Genoa, Nevada. Project consists of constructing an altitude valve, associated piping, and appurtenances adjacent to the Sierra Shadows water tank. PWP # DO-2023-165 FWE #2446 Construction of an altitude valve adjacent to the existing Sierra Shadows water tank. The project includes installation of piping, a precast vault, and installation of the altitude valve and appurtenant equipment. Douglas County is pre-purchasing the altitude valve and will provide the valve to the contractor. Pre-Bid Meeting Info: None The Engineers estimate for this work is $170,000.

Award

Water / Sewer

$196,600.00

Public - County

Site Work

10

22

4

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
44
Bidding Soon
406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

March 14, 2023

Project location map

CARSON STREET, Minden, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.