BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Scottdale, Pennsylvania. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of February 22, 2023, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. The Estimated Cost for the project is $ 116,000. Bids are being accepted for Scottdale Borough's 2023 Roadway Improvement Projects, consisting of three (3) contracts. A pre-bid conference will not be held. Any questions concerning the project, locations, and the bidding procedure can be directed to Widmer Engineering at 724-626-1909. A ten percent (10%) bid bond is required and the successful bidder(s) will need to obtain a payment and performance bond of 100% of the contract(s). The Borough reserves the right to decrease quantities, waive any bid informalities, or defects, delete any streets from the scope of work, reject any or all proposals, and accept such proposals deemed to be in the Borough's best interest. The Borough of Scottdale is an Equal Opportunity Employer and does not discriminate because of race, color, religious creed, handicap, ancestry, national origin, age, or sex. Addenda, if any, will be issued to only those persons who are registered as having obtained Contract Documents. All addenda will be issued to the email addresses below. Delivery confirmation to the email address provided will constitute a receipt of the addenda by the contractor. It is the contractor's responsibility to check their email addresses at appropriate intervals. Any questions regarding the project must be sent via email to seby@widmerengineering.com. All questions and answers will be posted to the bid. Questions will not be answered via phone calls during bid stage. A.D.T. less than 1000. Placing Single and Bouble Application is of Asphalt Seal Coat as specified in Attachment 1. Contractor is to use E-3M (CRS-2PM) oil and Number 8 course aggregate at 1.0% wash and fog seal as per 408 at the above locations of work.

Final Planning

Roads / Highways

$116,000.00

Public - City

Paving, Site Work

3

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
30
Bidding Soon
744
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2023

August 22, 2023

img_map_placeholder

Multiple Locations, Scottdale, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.