Demolition, site work and new construction of a fire / police facility in Mesa, Arizona. Completed plans call for the demolition of a fire / police facility; and for the construction of a fire / police facility.

C10120 Fire Station 205 Rebuild The purpose of this project is to rebuild an existing fire station. The scope of the project may include: 1. Accommodations for multiple fire department crews; 2. Up to four (4) pull-through bays; 3. Secured site and parking lot; 4. Public parking lot; 5. Temporary station; 6. Alternate locations; 7. On-site, Off-site and Utility Improvements; 8. Other miscellaneous improvements at all Sites, as determined and deemed necessary with the Project design and development The estimated construction cost is $8,000,000 - $10,000,000 The City anticipates commencing construction in late 2024 C10124 Fire Station 223 The purpose of this project is to construct a new fire station. The scope of the project may include: 1. Accommodations for multiple fire department crews; 2. Up to four (4) pull-through bays; 3. Secured site and parking lot; 4. Public parking lot; 5. On-site, Off-site and Utility Improvements; 6. Other miscellaneous improvements at the Site, as needed The estimated construction cost is $8,000,000 - $10,000,000 The City anticipates commencing construction in mid 2024 C10128 Fire Station 224 The purpose of this project is to construct a new fire station. The scope of the project may include: 1. Accommodations for multiple fire department crews; 2. Up to four (4) pull-through bays; 3. Secured site and parking lot; 4. Public parking lot; 5. On-site, Off-site and Utility Improvements; 6. Other miscellaneous improvements at the Site, as needed. The estimated construction cost is $8,000,000 - $10,000,000 The City anticipates commencing construction in mid 2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Fire / Police

$10,000,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
14
Bidding Soon
698
All Active Projects
240
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.