Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Miami Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of April 24, 2023, this project has not yet been awarded. A timeline or award has not yet been established. Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Questions must be directed to liviabarcelos@miamibeachfl.gov, with a copy to the City Clerk rafaelgranado@miamibeachfl.gov. The Work under this Contract includes mobilization and demobilization, furnishing and installing approximately 80 linear feet of 16-inch zinc-coated ductile iron pipe and fittings for water main, 1,550 linear feet of 12-inch zinc-coated ductile iron pipe and fittings for water main, 5,400 linear feet of 8-inch zinc-coated ductile iron pipe and fittings for water main, 600 linear feet of 6-inch zinc-coated ductile iron pipe and fittings for water main, 120 linear feet of 4-inch zinc-coated ductile iron pipe and fittings for water/fire service connection, removing and salvaging eleven (11) fire hydrant assemblies, furnishing and installing eleven new (11) fire hydrant assemblies with guard posts; eighty four (84) service lines from the new water main to new meter boxes requiring close coordination with City of Miami Beach, protection of, and transfer of existing water meter and service from the old to the new meter box and plugging existing service lines from the old water main (contractor shall be responsible for replacing any item damaged during construction); installing ARVs; installing flushing valves; making thirty eight (38) connections to existing 4-inch, 6-inch, 8-inch, 10-inch, 12-inch, 16-inch, and 20-inch water mains including installing tapping sleeves, valves or solid sleeves, as necessary; furnishing and constructing air release valve assemblies; polyethylene encasement for ductile iron pipe and fittings; sheeting and shoring ordered left in place if ordered by the Engineer; additional suitable backfill, if needed; permanent pavement restoration; milling and asphalt overlay of existing roadways as shown on plans; temporary pavement to maintain traffic; furnish all materials, equipment and supplies necessary for cleaning, testing and disinfecting the mains; removal of existing asphalt pavement and sod; removal, transport and legal disposal of demolition material; traffic control; dewatering and disposal of product water; installing and maintaining stormwater pollution prevention materials; permitting; temporary and permanent replacement of any sidewalk, curbs, sod, pavement markings, pavement and/or driveway damaged by construction; tree protection, trimming, root pruning, removal, relocation, and/or replacement as necessary; coordination with City forces; and all other appurtenant and miscellaneous items and work for a complete, fully functional and satisfactory installation. Bid security percent:5% Neighborhood: Flamingo Lummus. This project entails the replacement of the existing water mains along the following corridors: o 14th Street and 13th Street, from Alton Rd. to Michigan Ct. o Michigan Ct. from 13th St. to 14th St. o 10th St. from Alton Rd. to Washington Ave. o 8 th St. from Lenox Ave. to Michigan Ct. o Lenox Ave. from 9th St. to 8th St. o Michigan Ct. from 8th St. to 6th St. o 7th St. from Alton Rd. to Jefferson Ct. Question Deadline 10/14/2024 at 5:00 PM ET
Post-Bid
Roads / Highways
$4,092,765.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2024
February 7, 2025
Multiple Locations, Miami Beach, FL
Related To This Project
Miami Beach, FL
Bid Date: Feb 08 2023
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Mar 08 2023
Miami Beach, FL
Bid Date: Feb 10 2023
Miami Beach, FL
Bid Date: Jun 23 2023
Miami Beach, FL
Bid Date: Dec 09 2024
Miami Beach, FL
Bid Date: Feb 09 2023
Miami Beach, FL
Bid Date: Mar 06 2023
Miami Beach, FL
Bid Date: Jan 25 2023
Miami Beach, FL
Bid Date: May 03 2024
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Jan 25 2023
Miami Beach, FL
Bid Date: Jan 25 2023
Miami Beach, FL
Bid Date: Jan 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.