BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a pre-engineered storage facility in Storm Lake, Iowa. Completed plans call for the renovation of a pre-engineered storage facility.

"As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information". The project consists of removing existing roof membrane, ballast, and insulation and replacing with new ballasted EPDM membrane with insulation and vapor barrier per drawings and specifications. Storm Lake Maintenance Garage Roof Replacement Location- 1301 W Milwaukee Ave Storm Lake, IA 50588 Contractor to be a licensed roofer in the state of Iowa. DOT Estimated Start Date: To be coordinated with project manager once notice to proceed email has been issued. Estimated Completion date: September 22, 2023 Davis-Bacon wages do not apply. Award: It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. Question Cuttoff Date & Time 2/5/2023 11:00:00 PM (ET) Questions: All questions related to this project are to be submitted through the IONwave Bid system through the cut off period for question submissions. IADOT - Storm Lake Maintenance Garage Roof Replacement - The project consists of removing existing roof membrane, ballast, and insulation and replacing with new ballasted EPDM membrane with insulation and vapor barrier The Guarantee must include, but not be limited to the following elements and services: 1. Repair or replace defective materials, equipment, workmanship and installation that develops within the guarantee period, promptly and to Iowa DOT's satisfaction and correct damage caused in making necessary repairs and replacements, including all other damage done to areas, materials, and other systems resulting from the failure or defect, under guarantee by and at the expense of the Contractor. 2. Replace material or equipment that requires excessive service during guarantee period, as defined and as directed by the Iowa DOT. 3. Make all service calls, replacements, repairs and adjustments during the guarantee period without cost to the Iowa DOT. Summary Project Description:The project consists of removing existing roof membrane, ballast, and insulation and replacing with new ballasted EPDM membrane with insulation and vapor barrier. Replace metal flashings, scuppers and downspouts.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$400,000.00

Public - State/Provincial

Renovation

7

13

10

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
26
Bidding Soon
465
All Active Projects
147
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 13, 2023

March 13, 2023

September 22, 2023

img_map_placeholder

1301 W Milwaukee Ave, Storm Lake, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.