Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Cheyenne, Wyoming. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.

The project will consist of demolition and replacement of existing curb and gutter and adding new parking spaces at the Central Mail Facility. Question Deadline 03/07/2023 at 2:00 PM MT QD date changed from 02/21/2023 to 03/07/2023 , Written questions about the procurement process should be submitted by through the Public Purchase online Estimated Project Completion date is: November 30, 2023

Award

Sidewalks / Parking Lot

$76,424.00

Public - State/Provincial

Paving, Site Work

7

11

7

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
27
Bidding Soon
678
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2023

April 20, 2023

Project location map

706 W 18th St, Cheyenne, WY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed