Renovation of a mixed-use development in San Diego, California. Completed plans call for the renovation of a 12,670-square-foot multi-residential development; and municipal facility.

Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day License Requirements B or C-10 or C-46 Project Duration 264 Working Days 2.1 The Design-Builder shall perform commissioning of the renewable energy systems and meters/submeters for both the ETDC and Chollas sites. 2.2 The Design-Builder shall provide and install a complete solar photovoltaic system for Chollas Buildings A & B. The solar photovoltaic system will provide energy to the two Chollas Buildings. The Design-Builder shall provide all design, permits, materials for construction/installation, utility coordination, and testing and commissioning of approximately 236 kW of solar power systems total (Approximately 105 kW for Building A and 131 kW for Building B), or system that produces maximum output possible based on the available space. The system will include rooftop mounted solar systems. 2.3 The Design-Builder shall provide and install a complete solar photovoltaic system for the Employment Training Development Center (ETDC) parking lot and interconnect to ETDC building. The solar photovoltaic system will provide energy to the ETDC building. The Design-Builder shall provide all design, permits, materials for construction/installation, utility coordination, and testing and commissioning of approximately 190 kW of solar power systems total, or system that produces maximum output possible based on the available space. The system will include rack/canopy mounted systems (parking lot). 2.4 The Design-Builder shall design and construct each site to obtain the highest kilowatthour (kWh) output at the lowest cost and be installed as necessary to accommodate the individual aesthetics and requirements based on building characteristics, location, and ease of access. All solar power generating equipment, inverters, and metering must meet the manufacturer's equipment installation and warranty requirements. 2.5 The Design-Builder shall assist the City in the preparation and submittal of Net Energy Metering (NEM) Interconnection Application and Agreement for the solar photovoltaic systems, in accordance with Rule 21 from local electric utility service company. All equipment required for SDG&E interconnection including meters should be the Design-Builder's responsibility. 2.6 The Design-Builder shall evaluate and provide recommendation on the final system size based on available data and facility need. 2.7 The Design-Builder shall incorporate the accessibility requirements in the design where applicable. For the Preliminary Accessibility Evaluation report, please refer to Attachment CC. It is the Design-Builder's responsibility to ensure that the project design complies with current accessibility codes and regulations. 2.8 The Design-Builder shall incorporate environmental requirements in both the design and construction where applicable. For the Preliminary Environmental Assessment report, please refer to Attachment DD for Chollas Buildings A and B and Attachment EE for ETDC Building. All those wishing to submit a Proposal are encouraged to visit the Work Site with the Engineer. The purpose of the Site visit is to acquaint the Proposers with the Site conditions. To request a sign language or oral interpreter for this visit, call the Public Works Division at (619) 533-3450 at least 5 Working Days prior to the meeting to ensure availability. Response Format Electronic Project Type RFP (Request for Proposal) Type of Award Lump Sum Online Q&A No All questions related to this solicitation shall be submitted to: JEEspindola@sandiego.gov Questions received less than 14 Days prior to the Proposal due date may not be considered.

Post-Bid

Multi-Residential

$2,425,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
44
Bidding Soon
735
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

July 3, 2023

img_map_placeholder

Multiple Locations, San Diego, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.