BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Lincoln, Nebraska. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This contract is primarily focused upon the reconstruction of sidewalk and curb ramps. There is an immediate need for repair of sidewalks at the locations as shown on the plans. The Contractor shall coordinate the Beginning of Work date with the Project Manager. Once Work commences, it is expected that the Contractor remain on site until the completion of the project. This project includes sidewalk and curb ramp reconstruction in various locations in northwest Lincoln. The plan set indicates locations of sidewalk repairs needed and are approximate and subject to change. The Contractor shall coordinate with the Project Manager regarding upcoming repair locations. The City will mark the actual sections of sidewalk and ramps which require repair upon receiving notification from the Contractor a minimum of seven days in advance of anticipated construction. The Contractor shall be required to complete all repair work and site clean-up at any given location within seven working days of initial removals at that location. The Work will involve removal and reconstruction of curb and sidewalk according to Lincoln Standard Plan No. 600 for sidewalk ramp construction. The City's Project Manager will determine with the Contractor the specific type of ramp construction at each location. Sidewalk and curb ramps must be poured back within three (3) working days after removal, unless granted additional time by the Project Manager. Curb ramps on opposing corners of intersections must be phased unless the Project Manager approves removal of multiple corners. The Contractor shall minimize their construction area so that disruption to pedestrians and existing vegetation and/or landscaping in the park space area will be held to a minimum. The Contractor will be responsible to backfill disturbed areas with suitable topsoil in accordance with City specifications. Concrete rubble and construction debris placed within public right- of-way must be removed prior to the completion of the Contractor's activities on a daily basis. Any rubble and debris allowed to remain in the public right-of-way for greater than 24 hours may be removed by the City at the Contractor's expense.

Award

Sidewalks / Parking Lot

$149,189.00

Public - City

Paving, Site Work

7

4

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
59
Bidding Soon
827
All Active Projects
353
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2023

April 1, 2023

November 1, 2023

img_map_placeholder

Multiple Locations, Lincoln, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.