Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 31, 2023
Conceptual
Educational
$152,000,000.00
Public - City
Addition, Demolition, New Construction, Paving, Renovation, Site Work
Multiple Locations, Tulsa, OK
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Demolition, site work, paving, new construction, renovation and addition to a mixed-use development in Tulsa, Oklahoma. Conceptual plans call for the addition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; office development; playground / park / athletic field; for paving for a playground / park / athletic field; swimming pool; swimming pool; and theater / auditorium.
The $152 million bond that was approved by the voters and passed. As of October 3, 2023, further details regarding design and construction timelines have not been identified for all projects. Several projects have already been bid out or started. One of the signature projects in the bond is to "significantly reconfigure" its 6th and 7th grade building to ease students' transition from elementary school to middle school. The full list of inclusions on the bond include: (provided by Union Public Schools) Interior/Exterior Renovations: An estimated $46 million of the bond will go toward building interior and exterior renovations to include HVAC, roof replacements, safety and security upgrades, utility systems, paving, playgrounds, flooring, painting, windows, doors, millwork, lighting, furniture, fixtures, and equipment at sites throughout the district. Safety & Security: Extensive changes are planned throughout the district, including: The deployment of additional security cameras, door prompt sensors and other enhancements. At Jarman Elementary, the entrance and front office will be renovated to upgrade security. A new gym at the 6th /7th Grade Center will be a hardened facility to withstand tornado-strength winds and will also serve as the new home of Union's spirit and winter guard programs. Air quality in buildings will be heightened considerably through roof and HVAC changes; and playground and sidewalk updates will improve child safety; and A fire-retardant curtain will be installed at the High School studio theater in the event of a fire. Technology, textbooks, digital curriculum, and instructional resources will represent a $31 million investment. Union will continue to fund "1-to-1" (one computer device for every student), as it proved especially critical during the pandemic; the district will enter phase 2 of the program, replacing older laptops. This category includes the purchase of laptops, iPads, software, licenses, copiers and assorted hardware, as well as textbooks and instructional resources. In addition, each Union site and department would also receive an allocation, some of which may fall in this category. Athletics & Fine Arts Facility Upgrades: Student participation in extracurricular activities continues to skyrocket, which bolsters Union's graduation rate. Projects will include: Renovation of the Performing Arts Center's aging "back of house" (dressing room areas) and orchestra pit, new orchestra shell and the installation of new intelligent light system. Uniforms, equipment, technology and musical instruments for Athletics and Fine Arts. UMAC improvements to include a higher-resolution video/score board, sound system, sport lighting and exterior renovations. New gym and practice facility at the Union 6th/7th Grade Center. Resurfacing of tennis courts and turf replacement at the soccer practice and regular fields at the 8th Grade Center, the indoor baseball/softball practice facility and at the High School track; and Pool upgrade at the Sixth/Seventh Grade Center.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
![](https://projects.constructconnect.com/hubfs/assets/images/backgrounds/signup-form-mock-1.png)
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
Don't miss Bidding Projects!
Within 75 Miles of this Project:
Related Projects
Tulsa, OK
Bid Date: Dec 19 2023
Tulsa, OK
Bid Date: Mar 06 2023
Tulsa, OK
Bid Date: Mar 24 2023
Tulsa, OK
Bid Date: Mar 08 2023
Tulsa, OK
Bid Date: Mar 14 2023
Tulsa, OK
Bid Date: Mar 10 2023
Tulsa, OK
Bid Date: Aug 31 2023
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
Bid Date: Mar 24 2023
Tulsa, OK
Bid Date: Apr 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--