Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Santa Ana, California. Completed plans call for the renovation of a transportation facility.
THE COUNTY OF ORANGE, OC PUBLIC WORKS DEPARTMENT IS SOLICITING PROPOSALS TO ESTABLISH A CONTRACT FOR THE JWA TERMINAL ACCESSIBILITY IMPROVEMENTS PHASE 1 PROJECT. THIS CONTRACT WILL BE FUNDED BY A GRANT FROM THE FEDERAL AVIATION ADMINISTRATION. THEREFORE, THE REQUIREMENTS OF TITLE 2 OF THE CODE OF FEDERAL REGULATIONS (C.F.R.), PART 200 AND 200.317-200.326 OF THE FEDERAL AVIATION ADMINISTRATION (FAA) AIRPORT IMPROVEMENT PLAN. AND 49 CFR PART 26, PARTICIPATION BY DISADVANTAGED BUSINESS ENTERPRISES IN DEPARTMENT OF TRANSPORTATION PROGRAMS, APPLY TO THIS CONTRACT. THE COUNTY HAS NOT ESTABLISHED A CONTRACT SPECIFIC GOAL FOR THIS OPPORTUNITY BUT HAS ESTABLISHED AN OVERALL DBE GOAL FOR AIRPORT PROJECTS. THE OVERALL DBE GOAL FOR AIRPORT PROJECTS FOR FEDERAL FISCAL YEARS 2023 THROUGH 2025 IS 6.3% FOR THE UTILIZATION OF FIRMS OWNED AND CONTROLLED BY SOCIALLY AND ECONOMICALLY DISADVANTAGED PERSONS. ANY COUNTY RESPONSE RELEVANT TO THIS RFQ OTHER THAN THROUGH OR APPROVED BY OC PUBLIC WORKS/PROCUREMENT SERVICES IS UNAUTHORIZED AND WILL BE CONSIDERED INVALID. PROPOSERS ARE REQUIRED TO PAY PREVAILING WAGES FOR ALL APPLICABLE WORK PERFORMED ON COUNTY PROPERTY. PLEASE SEE ATTACHED ORANGE COUNTY DISTRICT ATTORNEY'S PUBLIC WORKS UNITS FOR INFORMATION ON PREVAILING WAGES. A. Provide cost estimates per County of Orange requirements, review and confirm the initial budget, and provide continuous cost management to assure the design and construction costs remain within the budgeted cost estimate. B. Commit to a Guaranteed Maximum Price (GMP). C. Validate, verify and refine detailed Project Program. D. Verify the schedule is appropriate for the Project. E. Confirm Project criteria are appropriate. F. Develop the schematic design deliverables per County of Orange requirements. G. Develop the design development deliverables per County of Orange requirements. H. Develop the construction documents deliverables per County of Orange requirements. I. Develop Building Information Models from project inception through design (LOD 300), construction (LOD 400-500), and closeout (LOD 500) in conformance with County of Orange requirements. J. Develop asset index database for incorporation into AssetWorks in conformance with County of Orange requirements. K. Provide design phase services per County of Orange guidelines and as necessary to construct the Project. Procure all agency review, peer review and local agency approvals, and obtain permits as required. At each phase comply with design review and approval process per County of Orange requirements. L. Provide construction planning, phasing, and scheduling, and execution during design and through construction completion and closeout service. M.Develop and maintain a Project schedule that incorporates all tasks and approvals of all involved parties necessary to complete the Project within the contract durations. N. Provide quality control and quality assurance. O. Publicly advertise for trade subcontractors and prequalify trade contractors to comply with County of Orange requirements. P. Develop Trade Contractor Bid Packages and receive bids in the most logical, competitive, and seamless manner. Q. Pay prevailing wages and comply with prevailing wage laws. R. Manage and administer the Project construction phase to achieve construction completion within the contract time and budget and with high-quality workmanship Question Deadline 02/02/2023 at 2:00 PM PT RFP Pre-proposal Conference - TBD Week of February 20, 2023 RFP Q&A ends - 2:00 PM PT the Week of February 20, 2023 Contract duration: 5 years.
Post-Bid
Transportation Terminals
$12,000,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2023
May 5, 2023
18601 Airport Way, Santa Ana, CA
Related To This Project
Santa Ana, CA
Bid Date: Feb 28 2023
Santa Ana, CA
Bid Date: Feb 03 2023
Santa Ana, CA
Bid Date: Feb 03 2023
Santa Ana, CA
Bid Date: Feb 06 2023
Santa Ana, CA
--
Santa Ana, CA
--
Santa Ana, CA
Bid Date: Dec 09 2020
Santa Ana, CA
Bid Date: Mar 06 2023
Santa Ana, CA
Bid Date: Mar 13 2023
Santa Ana, CA
Bid Date: Feb 07 2023
Santa Ana, CA
Bid Date: Feb 24 2023
Santa Ana, CA
Bid Date: Jun 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.