BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Worth, Texas. Completed plans call for site work for a water / sewer project.

A SCADA software, Ignition to be used for the new HMI has been procured by the City and will be provided by the City for use in implementation, installation, configuration, testing and startup of the replacement system on the City's potable water treatment facilities - North Holly, South Holly, Rolling Hills, Westside, and Eagle Mountain Water Treatment Plants (WTPs) . Currently three different Human Machine Interface (HMI) platforms are utilized. These include HSQ-Miser, GE Cimplicity, and Allen-Bradley FactoryTalk View SE, all of which report to a head-end HMI (HSQ-Miser). The project includes the design, installation, configuration, testing and maintenance through Final Acceptance of a complete SCADA replacement for the City's Water Department SCADA system, inclusive of but not limited to: upgraded SCADA systems at each of the five WTPs; a new centralized SCADA system; an upgraded network architecture to support the SCADA replacement; a new data architecture to support a comprehensive historical data collection and reporting interface and other work elements to support the SCADA upgrades. The Contractor shall provide the following project services. Pre-Construction Services including Familiarization and Preliminary Assessment and Design Services for SCADA system architecture and component selection requirements. Construction Services to include Programming and Configuration; Factory Acceptance Testing; Cutover, Field Testing, and Start-Up; System Maintenance, Final Acceptance, and Warranty. Questions Due Date Online Portal Deadline to submit Questions Apr 5th 2024, 2:00 PM CDT N/A Close Date Online Portal Deadline for Submissions Apr 12th 2024, 4:00 PM CDT N/A Intent to Bid Due Date Online Portal Deadline to indicate your intent to Bid Apr 12th 2024, 4:00 PM CDT Yes Deadline for Questions (anticipated) May 15, 2024, 5:00 PM CT Deadline for Responses via Addenda (anticipated) May 22, 2024, 5:00 PM CT Evaluation of Proposals (anticipated) May 31, 2024 through June 12, 2024 Oral Clarifications (anticipated, if required) June 6, 2024 through June 11, 2024 Notice to Proceed (anticipated) August 7, 2024

Post-Bid

Water / Sewer

$4,073,486.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
62
Bidding Soon
3,510
All Active Projects
1,391
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2024

August 8, 2024

img_map_placeholder

Multiple Locations, Fort Worth, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.