BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2024 at 8:00 PM

Updated May 2, 2025

Site work and paving for a mixed-use development in Bellevue, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Verlin Road - Pavement Reconditional project is part of a Local Road Improvement Program (LRIP) - (MSIS), which consists of roadway reconstruction of the existing street; including hot mix asphalt pavement, crushed aggregate base course, and concrete curb and gutter reconstruction (patching), concrete sidewalk reconstruction (patching), structure adjustments, storm sewer improvements and pavement marking. Question Deadline 01/12/2024 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. The work, in general, will include the approximate quantities and items listed below: Verlin Rd - Pavement Reconditioning (LRIP) o 8,400 SY - Remove Pavement o 4,000 LF - Remove and Replace Concrete Curb and Gutter o 2,500 SF - Remove and Replace Concrete Sidewalk/Driveway (Patching) o 8,400 SY - Hot Mix Asphalt Pavement o 1,000 CY - Common Excavation (Patching) o 2,000 TON - Crushed Aggregate Base Course (Patching) o 33 EA - Structure Adjustments o 12 EA - Structure Repairs/Replacements o 250 LF - Underdrain Construction o 12,300 LF - Pavement Marking o Erosion Control o Landscape Restoration Along Back of Curb East River - Trail Paving o 530 SY - Remove Pavement o 240 CY - Trail Excavation o 200 CY - Crushed Aggregate Base Course o 400 TON - HMA Trail Paving o 6,200 LF - Trail Shouldering o 200 SF - Concrete Sidewalk o 32 LF - 24" RCP Culvert o Erosion Control o Landscape Restoration DeBroux Park - Court Paving o 500 CY - Common Excavation o 500 CY - Crushed Aggregate Base Course o 1,410 SY - Hot Mix Asphalt o 550 LF - 10' Chain Link Fence o 40 LF - 4' Chain Link Fence o 4 EA - Pickleball Nets o 1 EA - Tennis Net The Verlin Road - Pavement Reconditional project is part of a Local Road Improvement Program (LRIP) - (MSIS), which consists of roadway reconstruction of the existing street; including hot mix asphalt pavement, crushed aggregate base course, and concrete curb and gutter reconstruction (patching), concrete sidewalk reconstruction (patching), structure adjustments, storm sewer improvements, and pavement marking

Award

Roads / Highways

$1,223,768.00

Public - City

Paving, Site Work

44

18

15

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
26
Bidding Soon
423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.