BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Naperville, Illinois. Completed plans call for the renovation of a power facility.

This work includes the design, manufacture, supply, factory test, deliver to the tollway substation in naperville, illinois, placement on the naperville electric utility's foundation, dress out, fill with oil, test, and installation supervision for two (2) 138-34.5 kv power transformers. The transformers shall be manufactured in the united states. Bid Bond 10% All questions concerning this bid shall be submitted in writing at least five business days prior to the online bid opening to Kim Schmidt at schmidtk@naperville.il.us. The deadline for questions is Friday, January 27, 2023 by 12:00 p.m. If required, a written response in the form of an addendum will be issued. No contact with the DEPARTMENT(S) shall be made during the bid process. Questions asked after the deadline are not guaranteed a response. Bid security in the form of a certified check or cashier's check payable to the City of Naperville, or a satisfactory bid bond, in the amount of Ten Percent (10%) of the total bid must be scanned and submitted with the E-Bid response. During the bid review process, the City may require a bidder to submit the original bid security to confirm authenticity. Prior to award of the contract, the contractor shall be required to obtain Performance and Payment Bonds as per Section 18 in the General Terms and Conditions. The City reserves the right to reject any or all bids or to waive any non-conformity in bids received whenever such rejection or waiver is in the best interests of the City. The City also reserves the right to reject the bid of a bidder who has previously failed to satisfactorily perform a contract, has not completed contracts on time, or whom investigation shows is not able to perform the contract This contract calls for the construction of a "public work" within the meaning of the Illinois Prevailing Wage Act (820 ILCS 130/1-12 et seq.). Contractors and subcontractors shall comply with the requirements of the Illinois Prevailing Wage Act including, but not limited to, all wage requirements and notice and recordkeeping duties including paying laborers, workers and mechanics performing work under this contract no less than the currently prevailing rate of wages in the county where the work is performed and filing a certified payroll with the public body in charge of the project.

Bid Results

Power Plant

$2,698.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
178
Bidding Soon
3,165
All Active Projects
1,371
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 24, 2023

October 27, 2023

img_map_placeholder

171 Shuman Blvd, Naperville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.