Site work for a water / sewer project in Trampas, New Mexico. Completed plans call for site work for a water / sewer project.

The Work under the Contract Documents may be generally described as follows: The Project work includes the following: control of water and irrigation demand, construction surveys, clearing, grubbing and demolition of existing dam, excavation and placement of compacted backfill (340 CY balanced onsite), excavation, stockpile, and placement of compacted channel bed material (124 CY balanced onsite), furnish and install 93 tons of structure rock and 21 tons of Class 'C' size rock, furnish and install structure logs and root wads, furnish and install 4 cubic yards of reinforced concrete, furnish and install 24" diameter water control gates and trash rack, furnish and install 50 linear feet of 24" diameter HDPE pipe, and 120 square yards of planting, seeding and stabilization. Clearing, grubbing and demolition of existing dam Compacted backfill, balanced onsite Excavate, stockpile, and place compacted channel bed material Furnish and install structure rock (see schedule of rock on sheet 4} Furnish and install Class 'C size rock (see schedule of rock on sheet 4) Furnish and install 24" diameter water control gates and trash rack Furnish and install 24" diameter HOPE Pipe Planting, seeding, and stabilizing Deduction for installing Ponderosa Pine structure logs & root wads in lieu of Douglas Fir Deduction for removal of Bid Item No. 8 - Excavate. stockpile, and place compacted channel bed material Deduction for furnishing and installing one (1) 24" diameter Waterman C-10 in leiu of Waterman C-20 Deduction for furnishing and installing 3/8" thick steel headwalls coated in epoxy' paint in leiu of reinforced concrete at heading and sluice structures (provide shop drawings) The CONTRACTOR shall commence Work upon receipt of a fully executed copy of this Agreement, but no later than March 1, 2023. All work will be substantially completed on or before May 15, 2023. The Work will be completed and ready for final payment in accordance with STANDARD TERMS AND CONDITIONS on or before June 30, 2023.

Bid Results

Water / Sewer

$176,241.00

Public - City

Site Work

9

5

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
2
Bidding Soon
141
All Active Projects
61
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2023

March 1, 2023

img_map_placeholder

To Be Determined, Trampas, NM

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.