Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Nashville, Tennessee. Completed plans call for the construction of a 160,000-square-foot laboratory facility; parking garage; and for site work for a laboratory facility.
**03/19/2024 is the Start of the Bid Solicitation Period, the CM is asking for the Pre-Qualification process to be complete prior to this Date** Construction is slated to start in May of 2024. Turner Construction is currently seeking to prequalify subcontractors and vendors interested in the construction of the new R.S. Gass State Health Laboratory located at R.S. Gass Boulevard, Nashville, TN. Interested parties should contact Amy Pedigo at apedigo@tcco.com for further steps to become prequalified. Plans call for the construction of a new modern public health laboratory at the State's RS Gass Complex in Nashville. Gross square footage of the building is estimated at 160,000 square feet. The identified site, at the corner of Ellington Parkway and Hart Lane, is to be cleared and graded to provide 6-7 buildable acres for the multilevel facility, potentially tiered parking, and landscaping elements. The Project will also include all necessary site improvements related to utilities, parking, and vehicular and pedestrian circulation.
Post-Bid
Laboratories
$130,000,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2024
July 15, 2024
Ellington Parkway and Hart Lane, Nashville, TN
Related To This Project
Nashville, TN
Bid Date: Feb 16 2023
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
Bid Date: Feb 09 2023
Nashville, TN
--
Nashville, TN
--
Nashville, TN
Bid Date: Feb 28 2023
Nashville, TN
Bid Date: Feb 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.