BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Clinton, Kentucky. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. Correct geometric deficiencies and improve safety, access, and regional connectivity from Clayton Street to KY-703 in Clinton. Item No. - 1-80203.00 Project Manager - James Tilley, P.E. User Division - Highway Design Approximate Fee - $400,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - STP Funds (Federal Funds) Project Length - Approximately 1.011 miles Enhance the pavement condition to account for increased truck traffic. Increase safety, access and repair existing conditions for bicyclists/pedestrians. Increase safety of intersections. This segment of US-51 serves as a direct link from Missouri to I-69. There is a papermill that has reopened about 16 miles north of the project. It serves as a direct route to I-69 and Missouri. I-69 connects Western Tennessee to Indiana through much of Western Kentucky. These factors have led to the increase in truck traffic and is expected to increase with the completion of I-69. The recently developed Rotary Park at the south end of the project will attract cars and pedestrians. There is a current lack of bike/ped facilities and accommodations leading to the park. The Consultant team shall include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. The plan should demonstrate how DBE companies will be mentored or used to assist in the area(s) pertaining to this contract. An additional page will be allowed in the Project Approach (Section 7) to exhibit this plan. A maximum of four (4) points will be considered in the Evaluation Factors for the DBE Participation Plan. Response Date: February 1, 2023 by 4:30 PM ET (Frankfort Time) First Selection Meeting: February 6, 2023 Final Selection: February 22, 2023 Pre-Design Conference: March 1, 2023 Consultant Fee Proposal: March 10, 2023 Contract Negotiations: March 22, 2023 Notice to Proceed: April 12, 2023 The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$300,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
2
Bidding Soon
277
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

img_map_placeholder

US-51, Clinton, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.