Site work and paving for a mixed-use development in Sully, Iowa. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Site Directions: The work to be done is generally located at 12476 Highway F62 E, Sully, Iowa Description: Excavation, Class 10 - 3,700 CY; Surface Grading-for existing granular surface in seal coat area - Lump Sum; Subgrade Preparation (6" Thick) - 10,610 SY; Subbase, 6" - 10,610 SY; Compaction Testing - Lump Sum; Storm Sewer, Trenched, ADS, 8" - 285 LF; Storm Sewer, Trenched, RCP, 12" - 60 LF; Storm Sewer, Trenched, ADS, 12" - 64 LF; Pipe Culvert, Trenched, RCP, 12" - 62 LF; Pipe Culvert, Trenched, RCP, 18" - 30 LF; Pipe Culvert, Trenched, CMP, 18" - 25 LF; Pipe Apron, RCP, 12" - 2 EA; Pipe Apron, RCP, 18" - 2 EA; Pipe Apron, CMP, 18" - 2 EA; Footing for Concrete Pipe Apron 12" - 2 EA; Footing for Concrete Pipe Apron 18" - 2 EA; SW-501 Intake - 2 EA; Connection to Existing Manhole - 2 EA; Pavement, PCC, 6" Thick - 9,940 SY; Sidewalk, PCC, 6" Thick - 535 SY; Pavement Removal - 4,440 SY; Bituminous Seal Coat - 2 Course - 2,660 SY; Painted Pavement Markings, Solvent/ Waterborne - Lump Sum; Temporary Traffic Control - Lump Sum; Traffic Signs (ADA Signage) - 6 EA; Hydraulic Seeding, Fertilizing, and Mulching - Lump Sum; SWPPP Management - Lump Sum; Silt Fence - 1,150 LF; and Mobilization - Lump Sum. Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the School Board on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. Building materials, supplies, and equipment incorporated into said improvement are exempt from Iowa Department of Revenue and Finance sales tax and any applicable local option sales tax and school infrastructure local option sales tax pursuant to Iowa Code Sections: 422.42 (15) & (16), and 422.47 (5). Bidder shall not include payment of Iowa sales tax in Bid. Owner will provide Purchasing Agent Authorization Letter and Designated Exempt Entity Iowa Construction Sales Tax Exemption Certificate. Contractor will coordinate sales tax exempt purchases with subcontractors and material and equipment suppliers. Contractor will maintain records identifying the materials purchased sales tax exempt and will maintain records verifying the use of said materials on said improvement. Payment to the Contractor for said improvements will be made in monthly estimates and one final payment. Monthly estimates will be equivalent to ninety-five percent (95%) of the contract value of the work completed during the preceding calendar month. Such monthly payment will in no way be construed as an act of acceptance for any part of the work partially or totally. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. Final payment to Contractor will be made no earlier than thirty (30) days from and after final acceptance of the work by the Owner. Before final payment is made, the Contractor shall file with the Owner lien waivers from material suppliers and/or subcontractors showing that they were paid in full for materials supplied and/or work performed on the project. Bid Security. Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the School District, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check, a certified check, or a bank money order drawn on a FDIC insured bank in Iowa or on a FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the School District. The bid shall contain no condition except as provided in the specifications. Preference of Products and Labor. Preference shall be given to domestic construction materials by the contractor, subcontractors, materialmen, and suppliers in performance of the contract and, further, by virtue of statutory authority, preference will be given to products and provisions grown. and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Liquidated damages in the amount of Eight Hundred Dollars ($800.00) per consecutive working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period or substantial completion milestone with due allowance for extension of contract period due to conditions beyond the control of the Contractor. Award of the contract will be to the lowest responsible bidder submitting the lowest acceptable bid selected by the School District. The School District hereby reserves the right to reject any or all bids, to waive informalities and irregularities and to enter into such contracts as it may deem to be for the best interest of the Lynnville-Sully Community School District. Only one contract will be awarded for project.

Bid Results

Roads / Highways

$950,770.00

Public - City

Paving, Site Work

9

8

4

7

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
62
Bidding Soon
1,166
All Active Projects
418
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 16, 2023

May 30, 2023

October 2, 2023

img_map_placeholder

12476 Hwy F62 E, Sully, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.