EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 16, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a detention facility in Marienville, Pennsylvania. Completed plans call for the renovation of a detention facility.

The scope of work includes, but is not limited to, replacement of the lighting controls, PLC's, and BAS systems throughout the facility in their entirety. The project shall provide the most effective & efficient systems possible with the least cost possible. The project will replace the existing Microlite Relay Panel Lighting Controls System with a new lighting controls system and replace the existing Programmable Logic Controllers (PLC's) with new PLC's. It will also replace the existing Building Automation System (BAS) with a new BAS. ESTIMATED CONSTRUCTION COST: $5,800,000.00. All applicants must be registered to view/download Project Documents and must have a Current, Active Vendor Number. All Applicants are required to create a user profile within e-Builder. Please click on the link below to create a user profile and view the documents. Please see e-Builder Invitation Documents tab for most recent COVID-19 Guidelines and site access requirements. Note that the requirements vary per site, and some agencies may have more stringent requirements. The PROFESSIONAL SELECTIONS MEETING is scheduled for THURSDAY, March 16, 2023 AT 10:00 AM. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. Applicants now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the project e-builder solicitation folder for instructions regarding Small Diverse Business and Veteran Business Enterprise participation. The Goals for SDB participation: 14% The Goals for VBE participation: 3% ADDITIONAL REQUIREMENTS OF SHORT-LISTED FIRMS The following information will need to be provided: detailed resumes for key design and management personnel with references; the firm's approach to the project, including descriptions of tasks and scope of services, and an explanation of how the approach provides value to the Commonwealth; a detailed description from the firm's portfolio of a project that illustrates the firm's ability to translate design intentions into a solution that meets the client's needs and expectations; an organizational chart and detailed work plan, identifying key personnel roles and percent of time assigned to the project; an explanation of how the firm assures high quality bidding documents; examples of relevant projects completed by the lead design professional and key personnel, with contact information for references for these projects; an assessment of key project issues and risks to the project; identification of special investigations, studies or testing that may be required; a description of how diversity will be accomplished within the team; evidence of financial capability; a list of professional liability claims and/or legal actions within the last ten years and a non-binding fee proposal. A video tutorial is available on the e-Builder site for first time users to learn how to navigate e-Builder. Technical support is also available via email at support@e-builder.net or by phone at 1-888-288-5717. Due to technical limitations, public selections must be viewed using a Windows PC. At this time, mobile devices are not supported. Interested parties may also watch the live selection process in the Public Works Arsenal Building, 18th and Herr Streets, Harrisburg, PA 17125. The online professional selections can be viewed by clicking the link. hone Conference ID: 103 860 540# Toll-free: 1 267-332-8737. To view a list of recommended firms and selection results click the link. Bids must be received by the purchasing agency on the Solicitation Due Date no later than the Solicitation Due Time as set forth in the solicitation. Any conflict between the dates and/or times contained in the solicitation itself or its attachments and this advertisement shall be resolved in favor of the solicitation. Amended Date: 01/23/23.

Post-Bid

Jails / Prisons

$5,800,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Commissioning
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Static Uninterruptible Power Supply, Lighting, Exterior Lighting
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
53
Bidding Soon
742
All Active Projects
332
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

April 17, 2023

img_map_placeholder

153 Woodland Dr, Marienville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SCI Forest - Upgrade/Replace PLC and Microlite System and BAS Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.