Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 6, 2023 at 7:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Dundee, Michigan. Completed plans call for site work for a water / sewer project.
The repair of two (2) sanitary sewer manholes (MH 6-83 and MH 6-44) and removal of one (1) sanitary sewer manhole (MH 6-97) along Ann Arbor Road in Dundee, MI. Contact Person: Name: Mr. Vern Moore, P.E., The Mannik & Smith Group, Inc. Phone: 517.525.4998 Email: VMoore@manniksmithgroup.com The proposal must be accompanied by a cashier's check, certified check, or a bid bond made payable to the Village of Dundee, MI, in the sum of five percent (5%) of the amount of the bid. Upon awarding and signing of a contract, or in the event of bid rejection, such bid surety will be returned to the Bidder. Bids may be held for a period of sixty (60) days. The Owner reserves the right to reject any or all bids, including without limitation the right to reject any or all nonconforming, nonresponsive, unbalanced, or conditional bids and to reject the bid of any Bidder if the Owner believes that it would not be in the best interest of the project to make an award to that Bidder, whether because the bid is not responsive or if the Bidder is unqualified or of doubtful financial ability or fails to meet any pertinent standards or criteria established by the Owner. The Owner also reserves the right to waive all informalities in any bid should it be deemed in the best interest of the Owner to do so. Discrepancies between the multiplication of units of work and the unit prices will be resolved in favor of the unit price. Discrepancies between the indicated sum of any column of figures and the correct sum will be resolved in favor of the correct sum. Discrepancies between words and figure will be resolved in favor of words. The Bidder to whom the contract is awarded shall, within ten (10) calendar days after notice of award, enter into a written contract with the Owner and furnish bonds and proof of insurance as hereinafter specified. Failure to execute the contract or furnish satisfactory bonds and proof of insurance will be considered cause for annulment of award and forfeiture of the Bidder's surety. Following the execution of the contract, the Bidder shall become known as the Contractor.. After the project is completed and accepted by the Owner but prior to final payment, the Contractor shall secure a two (2) year Maintenance Bond in the amount of twenty-five (25) percent of the final construction cost rounded off to the nearest thousand dollars. All work shall be completed on or before April 1, 2023. All work shall be conducted during normal daytime hours unless otherwise approved by the Engineer. Normal daytime hours are considered to be Monday through Saturday from 7 a.m. to 7 p.m. No work shall be conducted during holiday periods. Liquidated damages will be assessed in the amount of $100.00 per calendar day in which the project remains incomplete beyond the contract completion date, except that all references to seasonal limitations will not apply. Liquidated damages will continue to be assessed each calendar day after the contract project completion date until all work on the project is completed, even if those days extend beyond any seasonal limitations. In the event that the project cannot be completed on time due to unforeseen circumstances, the contractor shall coordinate with the OWNER and ENGINEER to secure a change order to advance the Time of Completion as needed. Any questions regarding this bid shall be directed to the person listed below: Name: Mr. Vern Moore, P.E., The Mannik & Smith Group, Inc. Phone: (517) 525-4998 Email: VMoore@manniksmithgroup.com
Award
Water / Sewer
$101,500.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2023
March 2, 2023
Multiple Locations, Dundee, MI
Related To This Project
Dundee, MI
Bid Date: Feb 23 2023
Dundee, MI
Bid Date: Mar 27 2023
Dundee, MI
Bid Date: Mar 29 2023
Dundee, MI
Bid Date: Apr 24 2023
Dundee, MI
Bid Date: Apr 21 2023
Dundee, MI
Bid Date: Jun 29 2023
Dundee, MI
Bid Date: Aug 09 2023
Dundee, MI
Bid Date: Sep 14 2023
Dundee, MI
Bid Date: Jan 30 2020
Dundee, MI
Bid Date: Jun 28 2022
Dundee, MI
Bid Date: May 06 2022
Dundee, MI
Bid Date: Jun 08 2022
Dundee, MI
Bid Date: Feb 24 2022
Dundee, MI
Bid Date: Jan 06 2023
Dundee, MI
Bid Date: Nov 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.