BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Dayton, Ohio. Working plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

As of June 28, 2024, an architect has been selected and 90% of design is complete. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The City reserves the right to reject any and all proposals, to waive any ide regularities in a proposal, or to accept the proposal(s) which in the judgment of proper officials, is in the best interest of the City. The City reserves the right to accept a part or parts of a proposal unless otherwise restricted in the RFP or issue subsequent RFPs. The City reserves the right to approve or reject any sub-Contractors proposed for work under this proposal or waive any minor irregularities Neither the City nor Contractor shall be considered in default of this Agreement for delays in performance caused by circumstances beyond the reasonable control of the non-performing party. For purposes of this Agreement, such circumstances include, but are not limited to, abnormal weather conditions; floods; earthquakes; fire; epidemics; war, riots, and other civil disturbances; strikes, lockouts, work slowdowns, and other labor disturbances; sabotage; judicial restraint; and inability to procure permits, licenses, or authorizations from any local, state, or federal agency for any of the supplies, materials, accesses, or services required to be provided by either the City or Contractor under this Agreement, provided the aforementioned circumstances are not due to the negligence or fault of the asserting party or any of its agents, employees, contractors, sub-contractors and/or representatives. The purpose of the project is to design improvements for a new Sports Complex including synthetic turf in-fields on all diamonds, add multi-purpose fields, add, and improve parking lots, improve LED sports lighting, basketball field house building, storage buildings, restrooms, adult fitness areas and kids' playground, and pedestrian walkways. The goal is to have a premier multi-use sporting complex that is focused on reduced maintenance and provides innovative technology. When the design has been approved by the Department of Recreation the design firm will assist the City of Dayton in bidding out construction services and oversee the project. Design a layout of improvements to the property. Before designing improvements, provide a digital report of findings of a historical site test of the property. Testing should provide information to determine if possible Native American remains are within the property boundaries. Provide a cost estimate of improvements described in layout. Provide an overall complex improvement plan and phasing plan. Provide construction oversight. Prepare drawings, specifications, and contract documents for the first phase of complex improvements. Provide ADA compliant access where applicable. Improve the safety and playability of the ballfields. Improve the customer experience. Incorporate sustainable design principles, natural landscapes, native plants, water quality best management practices, and ecosystem protection into design of this project. Provide designs that are durable, efficient, and require minimal maintenance. Question Deadline 06/16/2023 at 12:00 PM ET

Final Planning

Playgrounds / Parks / Athletic Fields

$9,558,000.00

Public - City

Renovation, Site Work

3

5

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
125
Bidding Soon
2,721
All Active Projects
1,207
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 1, 2024

December 31, 2025

img_map_placeholder

To Be Determined, Dayton, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.