Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Bridgeton, Missouri. Conceptual plans call for site work for a bridge / tunnel; and water / sewer project.
As of October 30, 2024, this project is in the design phase. An engineer has been selected for the project. A firm timeline for bidding and cosntruction has not been established. This project is included in the city’s 2024-2028 Capital Improvement Program (CIP). This project provides for the construction of a new culvert and/or the enhancement of existing facilities and improvements to the lower channel to increase the capacity of stormwater conveyance. The channel and banks shall be stabilized using bio stabilizations measures or other techniques as deemed appropriate. One or more grade control may be required within this reach to address headcutting based on an engineering assessment. Utilize urban forestry to restore and enhance the channel corridor. Goals: Eliminate or reduce erosion, structure and yard flooding and associated risks to yards and miscellaneous structures in the impacted areas. Maintain/improve property values and enhance the safety and quality of life of the neighborhood residents. Reduce annual maintenance costs associated with the investigation and repair of identified storm water problems. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$580,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
Terry Ave, Bridgeton, MO
Related To This Project
Bridgeton, MO
Bid Date: Feb 29 2024
Bridgeton, MO
Bid Date: Jun 07 2024
Bridgeton, MO
Bid Date: Jun 25 2024
Bridgeton, MO
Bid Date: Mar 26 2019
Bridgeton, MO
--
Bridgeton, MO
--
Bridgeton, MO
Bid Date: Feb 13 2024
Bridgeton, MO
Bid Date: Jan 03 2024
Bridgeton, MO
Bid Date: Feb 04 2019
Bridgeton, MO
Bid Date: Nov 02 2023
Bridgeton, MO
Bid Date: Dec 07 2023
Bridgeton, MO
Bid Date: Oct 27 2023
Bridgeton, MO
Bid Date: Oct 24 2023
Bridgeton, MO
Bid Date: Feb 18 2022
Bridgeton, MO
Bid Date: Feb 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.