BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Bridgeton, Missouri. Conceptual plans call for site work for a bridge / tunnel; and water / sewer project.

As of October 30, 2024, this project is in the design phase. An engineer has been selected for the project. A firm timeline for bidding and cosntruction has not been established. This project is included in the city’s 2024-2028 Capital Improvement Program (CIP). This project provides for the construction of a new culvert and/or the enhancement of existing facilities and improvements to the lower channel to increase the capacity of stormwater conveyance. The channel and banks shall be stabilized using bio stabilizations measures or other techniques as deemed appropriate. One or more grade control may be required within this reach to address headcutting based on an engineering assessment. Utilize urban forestry to restore and enhance the channel corridor. Goals: Eliminate or reduce erosion, structure and yard flooding and associated risks to yards and miscellaneous structures in the impacted areas. Maintain/improve property values and enhance the safety and quality of life of the neighborhood residents. Reduce annual maintenance costs associated with the investigation and repair of identified storm water problems. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$580,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
30
Bidding Soon
829
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

img_map_placeholder

Terry Ave, Bridgeton, MO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.