Site work and paving for a civil project in Latimer, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Work under this project consists of approximately 5,400 feet of 24-inch through 12-inch storm drainage pipe (base bid and add alternate combined); approximately 10 manholes (base bid and add alternate combined); approximately 29 intakes; approximately 4,200 square yards of ACC pavement; seeding; along with appurtenant work. This work is shown in detail on the construction plans on file with the City Clerk. All bids must be filed on or before the Noon deadline previously stated. All bids shall be made on forms furnished by the City and must be enclosed in a separate sealed envelope and plainly identified. The City Council of Latimer, Iowa, will hold a public hearing on the proposed plans, specifications, form of contract and estimate of cost for the construction of said improvements in accordance with the provisions of Chapter 384, Code of Iowa, at 6:30 PM, on the 8th day of February, 2023, at City Hall in Latimer, Iowa. At said hearing any interested person may appear and file objections to the project and cost thereof Each proposal shall be accompanied by a bid bond, cashiers or certified check, or a credit union certified share draft, in a separate sealed envelope in an amount equal to ten percent (10%) of the total amount of the proposal. The certified or cashiers check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States or said certified share draft should be drawn on a credit union in Iowa or chartered under the laws of the United States; and such check or share draft shall be made payable to the City Clerk, City of Latimer, Iowa, as a security that if awarded a contract, the Bidder will enter into a contract at the prices bid and furnish the required performance and payment bond and certificate of insurance. The certified or cashiers check or certified share draft may be cashed, or the bid bond redeemed, if the Contractor fails to enter into a contract, or fails to provide a certificate of insurance within ten (10) days after the acceptance of his proposal by resolution of Council. No bidder may withdraw a bid within sixty (60) days after the date set for opening bids. The City reserves the right to reject any and all bids, to waive informalities and technicalities. The Council reserves the right to defer acceptance of any proposal for a period not to exceed sixty (60) calendar days after the date bids are to be received. If awarded, one (1) contract will be awarded to the lowest responsible, responsive bidder for Base Bid with add or replacement alternates or Alternate Bid with add or replacement alternates based on the amount of work and type of materials selected by the City. Liquidated damages in the amount of $1,000.00 per calendar day will be assessed for each day that work remains uncompleted after the deadline set below. Contractor shall begin work within ten days of the Owners Notice to Proceed, and work shall proceed continuously until completed. Work must be completed by December 1st , 2023. The successful bidder shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operation of the Contractor. In addition, the bond shall guarantee against defects in materials or workmanship for a period of two years after completion and acceptance by the City. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor to the extent lawfully required under Iowa statues. Payments will be made to the Contractor based on monthly estimates in amounts equal to ninety-five percent (95%) of the contract value of the work completed, including materials and equipment delivered to the job site during the preceding calendar month, and will be based upon an estimate prepared on the twenty-fifth (25th) day of each month by the Contractor, subject to the approval of the Engineer. Such monthly payment will in no way be construed as an act of acceptance for any part of the work partially or totally completed. The balance of the five percent (5%) due the Contractor will be paid not earlier than thirty-one (31) days from the date of final acceptance of said work by the City, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa, as amended. No such partial or final payment will be due until the Contractor has certified to the City Clerk that the materials, labor, and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications. Payments shall be made in cash from funds on hand; money from the sale of Bonds; or other monies which can be legally used for this work.
Post-Bid
Water / Sewer
$200,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 8, 2023
March 10, 2023
Multiple Locations, Latimer, IA
Related To This Project
Latimer, IA
Bid Date: Mar 23 2023
Latimer, IA
Bid Date: Mar 21 2019
Latimer, IA
Bid Date: Mar 19 2024
Latimer, IA
Bid Date: Mar 19 2024
Latimer, IA
Bid Date: Apr 17 2024
Latimer, IA
Bid Date: Jul 16 2024
Latimer, IA
--
Latimer, IA
Bid Date: Jan 20 2021
Latimer, IA
Bid Date: Jan 18 2023
Latimer, IA
Bid Date: Jul 19 2022
Latimer, IA
Bid Date: Dec 20 2022
Independence, IA
Bid Date: Feb 09 2023
Elkhart, IA
Bid Date: Feb 16 2023
Des Moines, IA
Bid Date: Feb 21 2023
Sully, IA
Bid Date: Feb 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.