Site work and paving for a mixed-use development in Clinton Township, Michigan. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Job Location Clinton Township Civic Center Question Acceptance Deadline 02/10/2023 05:00 PM EST Questions are submitted online No The approximate primary quantities involved in this work include, but are not limited to: Curb and Gutter, Rem - 345 Ft Pavt, Rem, Modified - 2,438 Syd Geotextile Separator - 3,650 Syd Aggregate Base, 6 inch - 180 Syd Aggregate Base, 9 inch - 3,650 Syd HMA, 5EML (2 inch) - 420 Ton HMA, 4EML (2 inch) - 420 Ton HMA, 2EML (4 inch) - 40 Ton Driveway Opening, Conc, Det M - 80 Ft Curb and Gutter, Conc, Det F - 2170 Ft Aggregate Surface CSE, 6 Inch - 63 Syd Curb Face Sidewalk, Conc, 6 inch - 3,110 Sft Sidewalk, Conc, 4 inch - 2,970 Sft Sidewalk, Conc, 6 inch - 925 Sft Sidewalk Ramp, Conc, 8 inch - 200 Sft Underdrain, Subgrade, 6 inch - 405 Ft Geocellular Confinement System & Grass Paving -1690 Syd Pervious Paving Pavers, Modified - 735 Sft Dr Outlet Control Structure - 2 Ea Sewer, PVC, Sch 80, 8 inch, Tr Det B - 195 Ft Sewer, Cl IV, 12 inch, Tr Det A - 218 Ft Flexamat Erosion Control - 370 Syd Universally Accessible Floating Dock & Gangway - Kayak Launch - 1 LS Pile, Steel, Furn and Driven, 8 inch with HDPE Caps and Sleeves - 200 Ft Sliding Gate - 2 Ea Fencing -100 Ft This primary work shall be included together with miscellaneous site furnishings and all other incidental work outlined on the Bid Form, which includes site clearing/removals, tree removals and restoration. A certified check, bank draft, or satisfactory bid bond, executed by the bidder and a surety company, payable to Clinton Township, in an amount at least equal to five percent (5%) of the bid amount, shall be submitted with each bid. BONDS AND INSURANCE The accepted bidder shall be required to furnish a satisfactory Performance Bond, and Labor and Material Bond in the amount of 100% of the Contract Price, and Maintenance and Guarantee Bond of 100% for two years of the Final Contract Price. The cost of the bonds will be paid by the accepted bidder. WITHDRAWAL OF BIDS No Bid may be withdrawn for a period of sixty (60) calendar days after receipt of bids. AWARD OF CONTRACT Each bidder agrees to waive any claim it has or may have against the Owner and their respective Employees, arising out of or in connection with the administration, evaluation, or recommendation of any bid. Clinton Township General Funds and Michigan Natural Resources Trust Fund monies are to be utilized for the project construction. The Charter Township of Clinton reserves the right to accept or reject any or all bids, to award the agreement to other than the low proposal, to negotiate the terms and conditions of all and any part of the bids, to waive irregularities and/or formalities, and in general to make award in the manner as determined to be in the Township's best interest and its sole discretion. Please contact Mr. Scott J. Chabot, P.E. from Anderson, Eckstein & Westrick, Inc. at (586) 306-2079 for any specific questions regarding this advertisement to bid. Bids shall remain firm for a period of sixty (60) days. The contractor and all subcontractors must comply with all requirements of 1976 PA 453 (Elliott-Larsen Civil Rights Act), the 1976 PA 220 (Persons with Disabilities Civil Rights Act), and Executive Directive 2019-09, as amended. In accordance with these laws, all contracts the grantee enters into must contain a covenant by the contractor and any subcontractors not to discriminate against an employee or applicant for employment with respect to hire, tenure, terms, conditions, or privileges of employment, or a matter directly or indirectly related to employment, because of race, color, religion, national origin, age, sex, height, weight, marital status, partisan considerations, or a disability or genetic information that is unrelated to the individual's ability to perform the duties of a particular job or position. The project shall commence immediately following a notice to proceed per these contract documents. Due to the unprecedented unknown availability of various materials and equipment for this project, the substantial completion will be determined after the awarded bidder, Engineer and Owner mutually agree upon a substantial completion date and phasing plan for the Work.

Award

Playgrounds / Parks / Athletic Fields

$1,077,562.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
100
Bidding Soon
1,378
All Active Projects
589
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

April 28, 2023

img_map_placeholder

40700 Romeo Plank Rd, Clinton Township, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.