EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 20, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Bellingham, Massachusetts. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: The work consists of construction, development, and performance testing of one 18" x 24" gravel packed replacement well, submersible pump, motor, VFD, pitless adapter, level transducer, site piping, maintenance hydrant, site valves, interior piping modifications, pressure transducer/transmitter, decommissioning of existing well, appurtenances, and associated electrical and instrumentation work. The Contractor will be asked to complete all necessary work required to start-up and commission the new well (including MassDEP approval to pump to distribution) within 120 calendar days. Meeting this substantial completion date may require existing electrical equipment (including the existing VFD) to remain in service due to lead times of proposed equipment. Between the dates June 15, 2023 and September 30, 2023, the downtime of the existing well must be minimized to the greatest extent possible. Proposed improvements to the pumping station and controls that are not necessary for start-up and commissioning of the new pump and that require a longer duration shut down, should be planned for no sooner than October 1, 2023. The time for final completion of this contract is 210 calendar days. Owner anticipates that the Project's total bid price will be approximately $375,000. To be considered a responsive Bidder, the Bidder shall have obtained at least one set of Bidding Documents from the Issuing Office using the name that is to appear on the Bid Form. The designated website will be updated periodically with addenda, lists of plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. It is the Bidder's responsibility to check the designated website for addenda. Instructions to Bidders For all further requirements regarding funding agency notifications, funding agency requirements, bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The bidding and award of this Contract will be under the provisions of M.G.L. Chapter 149, Section 44A-44J. Complete instructions for filing Bids and Sub-Bids are included in the Instructions to Bidders. In accordance, with M.G.L. Chapter 149, Section 44D, General Bids will be valid only when accompanied by; (1) a current certificate of eligibility issued by the Division of Capital Asset Management (DCAM), showing that the General Bidder has the classification of Sewage and Water Treatment Plants [Pumping Stations, General Building Construction] and a capacity to perform this work and (2) an update statement summarizing the General Bidder's record for the period between the latest DCAM certification and the date the bid is submitted. In accordance with M.G.L. Chapter 149, Section 44D, Filed Sub-bids will be valid only when accompanied by; (1) a current certificate of eligibility issued by the DCAM, showing that the Sub-Bidder has the corresponding category of work and a capacity to perform this work and (2) an update statement summarizing the Sub-Bidder's record for the period between the latest DCAM certification and the date the Sub-bid is submitted. Each General Bid and Sub-bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by a Bid Security in the amount of 5 percent of the Bid. The following filed Sub-bids are required for this work: 1. Electrical No Bidder may withdraw their Bid for a period of thirty (30) days, excluding Saturdays, Sundays, and legal holidays after the actual date of the opening of the General Bids. This advertisement does not obligate the Owner for any costs associated with preparing or submitting bids. The successful General Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner. Minimum wage rates as determined by the Executive Office of Labor and Workforce Development, Department of Labor Standards (DLS) under the provisions of M.G.L., Chapter 149, Section 26 to 27D, as amended, apply to this project. It is the responsibility of the contractor, before bid opening, to request if necessary, any additional information on Prevailing Wage Rates for those trades people who may be employed for the proposed work under this contract. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest

Bid Results

Water / Sewer

$63,600.00

Public - City

Site Work

15

17

2

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Pest Control Devices, Scales
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
178
Bidding Soon
3,286
All Active Projects
1,313
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

March 17, 2023

img_map_placeholder

To Be Determined, Bellingham, MA

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Well No. 12 Replacement Project - Sub Bids

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.