BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Cypress, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

A Proposal Bond from a bonding company acceptable to the Owner or a certified check in an amount equal to 10% of the greatest amount proposed must accompany each offeror's proposal. PAYMENT BOND AND PERFORMANCE BOND: A Payment Bond and Performance Bond, each in an amount equal to 100% of the Contract Sum conditioned upon the faithful performance of the Contract will be required. Refer to Section AB, Instructions to Offerors for detailed Bond requirements. The prevailing rates of wages as stipulated in the Supplementary Conditions herewithin are the minimums that must be paid in conformance with all applicable laws of the State of Texas. All Offerors (General Contractors) submitting proposals are encouraged to attend the proposal opening and visit the Project site. Subcontractors and Suppliers intending to submit proposals to General Construction Offerors are required to prepare their proposals based on a complete set of proposal documents. If after reviewing the complete set of proposal documents, Subcontractors and Supplier Offerors desire to purchase individual drawings and specification sections for their proposal convenience, they may do so by ordering the specific drawings and specifications directly from the reproduction company. Each offeror purchasing a partial set of proposal documents is responsible for determining exactly which documents he requires and is responsible for all costs associated with printing and delivery. Subcontractors and Suppliers exercising this option must agree to do so on the basis that 1) all documents shall be returned to the Architect, without refund, after submitting a proposal and 2) documents shall not be used on other construction projects. Successful Subcontractors and Supplier Offerors may retain their Proposal Documents until completion of the construction. The subcontractor/supplier is responsible for all the associated work and coordination when not obtaining a complete set of drawings. The Owner reserves the right to reject any and all proposals and to waive any informality in the Competitive Sealed Proposal process. No proposal shall be withdrawn within sixty (60) days after the proposal opening without the specific consent of the Owner. Refer to Offerors Section Document AB.

Post-Bid

Sidewalks / Parking Lot

$8,877,790.00

Public - County

Paving, Site Work

91

14

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
184
Bidding Soon
3,759
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

August 29, 2023

Project location map

22602 Northwest Fwy, Cypress, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.