BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2023 at 8:00 PM

Updated January 27, 2024

Renovation of an educational facility in Madison, Wisconsin. Completed plans call for the renovation of a educational facility.

In general, the work consists of ventilation improvements ot the Witte A Tower. Work includes installation of a new energy recovery unit, new supply and exhaust ductwork. Supporting work including general construction, electrical, fire protection and controls. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected. Base Bids will be received as a single lump sum bid for: 2) Fire Protection (Fire Suppression) 3) Plumbing 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Contact the Supplier Diversity Program with questions DiverseSpend@wi.gov, or visit their 13 website at: https://doa.wi.gov/Pages/DoingBusiness/SupplierDiversity.aspx. Bid Results FIRE PROTECTION WORK :: H.J. Pertzborn Plumbing & Fire Protection :: 94,715.00 PLUMBING WORK :: Hooper Corporation :: 5,968.00 MECHANICAL WORK :: Illingworth-Kilgust Mechanical, Inc. :: 1,128,000.00 ELECTRICAL WORK :: Forward Electric, Inc. :: 555,637.00

Bid Results

Educational

$1,784,320.00

Public - State/Provincial

Renovation

53

22

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
148
Bidding Soon
1,618
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2023

September 18, 2023

Project location map

615 W Johnson St, Madison, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.