BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and renovation of a water / sewer project in Rushville, Illinois. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

For Contract A - Water System Improvements Contract B - Water Storage Tank Painting The work shall generally consist of: CONTRACT "A" - WATER SYSTEM IMPROVEMENTS Demolition of the Logan Street concrete ground storage tanks, new Logan Street ground storage tank, demolition and replacement of the Hilltop Water Treatment Plant raw water ground storage tank, valve & hydrant replacements and miscellaneous electrical, controls, piping and appurtenances CONTRACT "B" - 500,000 GALLON ELEVATED WATER STORAGE TANK PAINTING Full rehabilitation of the 500,000 gallon Washington Street elevated water storage tank along with restoration of miscellaneous structural tank components ANY CONTRACT OR CONTRACTS AWARDED UNDER THIS INVITATION FOR BIDS ARE EXPECTED TO BE FUNDED IN PART BY A LOAN FROM THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY (ILLINOIS EPA). NEITHER THE STATE OF ILLINOIS NOR ANY OF ITS DEPARTMENTS, AGENCIES, OR EMPLOYEES IS OR WILL BE A PARTY TO THIS INVITATION FOR BIDS OR ANY RESULTING CONTRACT. THE PROCUREMENT WILL BE SUBJECT TO REGULATIONS CONTAINED IN THE PROCEDURES FOR ISSUING LOANS FROM THE WATER POLLUTION CONTROL LOAN PROGRAM (35 IAC PART 365), THE DAVIS-BACON ACT (40 USC 276A THROUGH 276A-5) AS DEFINED BY THE UNITED STATES DEPARTMENT OF LABOR, THE EMPLOYMENT OF ILLINOIS WORKERS ON PUBLIC WORKS ACT (30 ILCS 570), ILLINOIS WORKS JOBS PROGRAM ACT (30 ILCS 559/20-1), AND THE FEDERAL "BUILD AMERICAN, BUY AMERICA ACT" REQUIREMENTS CONTAINED IN THE INFRASTRUCUTRE INVESTMENT AND JOBS ACT, PUB. L. NO. 117-58(except as otherwise noted). "USE OF AMERICAN IRON AND STEEL" REQUIREMENTS AS CONTAINED IN SECTION 436 OF H.R. 3547, THE CONSOLIDATED APPROPRIATIONS ACT, 2014. THIS PROCUREMENT IS ALSO SUBJECT TO THE LOAN RECIPIENT'S POLICY REGARDING THE INCREASED USE OF DISADVANTAGED BUSINESS ENTERPRISES. THE LOAN RECIPIENT'S POLICY REQUIRES ALL BIDDERS TO UNDERTAKE SPECIFIED AFFIRMATIVE EFFORTS AT LEAST SIXTEEN (16) DAYS PRIOR TO BID OPENING. THE POLICY IS CONTAINED IN THE SPECIFICATIONS. BIDDERS ARE ALSO REQUIRED TO COMPLY WITH THE PRESIDENT'S EXECUTIVE ORDER NO. 11246, AS AMENDED. THE REQUIREMENTS FOR BIDDERS AND CONTRACTORS UNDER THIS ORDER ARE EXPLAINED IN 41 CFR 60-4 In submitting Proposals for the planned work, the Bidder shall declare that only persons or parties interested in the proposed work as Principals are those contained in the Proposal; and that the Proposal is made without collusion with any other person, firm or corporation. All questions of a technical nature regarding the project will only be answered in writing by Addendum. Any questions may be submitted by telephone or in writing to Jamie Headen, Project Engineer, jheaden@bentonassociates.com, 217-245-4146,or at the Pre-Bid Meeting. Questions should be submitted to the Engineer no later than five (5) working days prior to the bid date. Bid Result : Contract "A" - Hood Construction Group - $ 493,202.00 Contract "B" - Neumann Co. Contractors - $ 774,550.00 Contract "C" - Leander Construction, - $ 2,995,000.00

Award

Water / Sewer

$4,262,752.00

Public - City

Demolition, New Construction, Renovation, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
16
Bidding Soon
321
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 29, 2023

img_map_placeholder

Multiple Locations, Rushville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.