Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 17, 2023 at 7:00 PM
Updated September 10, 2024
Site work for a playground / park / athletic field in Lexington, Kentucky. Completed plans call for site work for a playground / park / athletic field.
The project scope consists of the removal and replacement of the synthetic turf system for the Tates Creek High School Football Stadium. The project will also consist of rejuvenation of the existing track surface including events, construction of a new pole vault runway and landing area, replacement of the discus throwing pad & cage, and the installation of new sand catcher systems for the long/triple jump events. No proposal shall be withdrawn for a period of sixty (60) days after the date of bid opening. The last date for the Architect to receive items to be addressed in any addenda is February 7, 2023 by 12:00 p.m. EST. All requests must be submitted to the Architect in writing. Bids will be received from Contractors for a Total Lump Sum Amount. All phases ofthe work shall be bid to and through the Contractor submitting the proposal. Bid Security in the amount offive (5) percent ofeach proposal submitted must accompany each Proposal in accordance with the Form ofProposal. The Owner reserves the right to accept any bid, to reject any or all bids, to waive any informalities in bids received where such acceptance, rejection, or waiver is considered to be in the best interest ofthe Owner or to reject any bid where evidence or information submitted by the bidder does not satisfy the Owner that the bidder is qualified to carry out the details ofthe Contract Documents. The Owner's desire to waive irregularities and informalities as to a bid shall be reviewed and finaljudgement made prior to approval ofthe contract. Federal Wage Rates are not applicable. State Wage Rates are not applicable. Conflicts ofinterest, gratuities and kickbacks are defined in KRS 45A.445 and as provided for in KRS 45A.455 are absolutely prohibited. Preference for resident bidders shall be given as outlined in KRS 45A.90 to 45A.94. The successfill bidder must supply a 100% Performance and Payment Bond as outlined in the Project Manual.
Post-Bid
Playgrounds / Parks / Athletic Fields
$361,950.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2023
March 14, 2023
1111 Centre Pkwy, Lexington, KY
Related To This Project
Lexington, KY
Bid Date: Feb 22 2023
Lexington, KY
Bid Date: Feb 03 2023
Lexington, KY
Bid Date: Feb 21 2023
Lexington, KY
Bid Date: Mar 02 2023
Lexington, KY
Bid Date: Feb 09 2023
Lexington, KY
Bid Date: Feb 17 2023
Lexington, KY
--
Lexington, KY
Bid Date: Jan 27 2023
Lexington, KY
--
Lexington, KY
Bid Date: Feb 01 2023
Lexington, KY
Bid Date: Feb 09 2023
Lexington, KY
Bid Date: Feb 17 2023
Lexington, KY
Bid Date: Feb 16 2023
Lexington, KY
Bid Date: Feb 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
