BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Pembroke Pines, Florida. Completed plans call for the renovation of a multi-residential development.

The City of Pembroke Pines is seeking proposals from qualified firms, hereinafter referred to as the Contractor, to Replace of all Mechanical Equipment at Pines Point Management Office, 501 NW 103 Ave Pembroke Pines 33026, In accordance with the terms, conditions, and specifications contained in this solicitation. This project is federally funded by the CDBG-CV1/CV3 and the Department of Housing and Urban Development (HUD) and thus will follow federal procurement guidelines. This project is on a strict time frame and has to be completed by August 2023. Questions Due Date: Feb 6th 2023, 11:30 PM EST Project Timeline 60 calendar days from NTP with an estimated start date of 3/1/2023 5% Proposal Security / Bid Bond , 100% Payment and Performance Bonds Project Cost Estimate $150,000 Demolish as required to accomplish work. All required demolition shall be included in the base bid package submitted by the contractor. Contractor to remove all old mechanical equipment and properly dispose of. A/C equipment shall be Trane. Contractor shall replace like for like on all the units. New units shall be rated in accordance with AHRI standards, have proper labeling and comply with all applicable current codes. Units to be stored and handled as per manufacture's recommendations. Install (2) 6-ton Trane split systems. Install (2) 7.5-ton Trane split system. Install (1) 1.5 ton Trane split system for restroom. Install (1) 7.5 ton Trane split system for leasing office. All unit to come with condenser coil coating and UV lights. Installation consists in disconnect and reconnect ducts, electrical, drain lines and refrigeration lines. Install lock out-tags as an electrical safety precaution. Flush refrigeration with R-11 to get rid of oil and residues from the old system. Install new Thermostats. Install new stands for Air handler units. Install new stainless steel drain pans with safety switches. Contractor responsible for all finishes to include drywall, concrete repair, painting and trim work associated with their work and shall leave all work areas in the same or better condition than they were originally. Install new flow switches for the air handler units. Install new L brackets to anchor down the condensing units for hurricane protection. Flush drain lines with dry nitrogen. Deep vacuum to be performed down to 500 microns to get rid of air and humidity in the system. New Armaflex insulation where applicable. Contractor to provide full start up service in coordination with equipment manufacturer to provide complete communication with city's Trane monitoring system. Contractor to provide a full test and balance report for the building and all related equipment, at the completion of the project to assure proper system functioning. Contractor is responsible for acquiring all necessary permits for the job and required documentation for such. Contractor will not be required to pay permit fees, as this is a city project.

Award

Multi-Residential

$176,430.00

Public - City

Renovation

3

5

2

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
129
Bidding Soon
1,793
All Active Projects
754
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 21, 2023

March 1, 2023

August 31, 2023

img_map_placeholder

501 NW 103rd Ave, Pembroke Pines, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.