BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Clearfield, Kentucky. Completed plans call for the renovation of a water / sewer project.

**Per Addendum 2 the bid date has been extended from 03/02/23 to 03/14/23** The intake structure will include installation of three (3) vertical turbine pumps mounted on a poured, circular, concrete structure. Two 30-inch intake pipes will extend into the Cake Run Lake at various levels for raw water supply. The project will include civil, process, mechanical, electrical, and instrumentation construction. All BIDDERS must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, and the Contract Work Hours Standard Act. All BIDDERS must comply with the President's Executive Order No. 11,246 (Equal Employment Opportunity) as amended, which prohibit discrimination in employment regarding race, creed, color, sex or national origin. All BIDDERS, Contractors and Subcontractors must comply with 41 CFR 60-4, in regard to Affirmative Action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4 as applicable. The intake structure will include installation of three (3) vertical turbine pumps mounted on a poured, circular, concrete structure. Two 30-inch intake pipes will extend into the Cake Run Lake at various levels for raw water supply. The project will include civil, process, mechanical, electrical, and instrumentation construction. All BIDDERS, Contractors and Subcontractors must comply with all American Iron and Steel Requirements. All BIDDERS must make positive efforts to use small, minority, women owned, and disadvantage businesses. Method of award will be made to the lowest, responsive, responsible BIDDER. The OWNER reserves the right to waive any informality or to reject any or all bids. Each BIDDER must deposit with his Bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. No BIDDER may withdraw his Bid within ninety (90) consecutive calendar days after the actual date of the opening thereof. This project will be subject to DOW Procurement Guidance including the Davis-Bacon Act. This project will be funded in part with an SRF loan.

Post-Bid

Water / Sewer

$287,733.00

Public - City

Renovation

42

16

15

8

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
34
Bidding Soon
692
All Active Projects
298
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2023

April 3, 2023

img_map_placeholder

KY-801, Clearfield, KY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.