BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Fresno, California. Completed plans call for the renovation of a educational facility.

The project generally consists of the construction of: Replace unit ventilators, air handlers, heat pumps, and EMS. The successful Bidder and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are on file with the District and are available to any interested party on request or at Bidders and Bidders' subcontractors shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code.To bid on this Project, the Bidder is required to have been prequalified by the District at or above $1M. In addition, if the Project has electrical, mechanical, or plumbing components that will be performed by subcontractors performing under the following license classification(s), then each of those subcontractors that intend to bid as a first-tier subcontractor to a general contractor (prime contractor) are required to have been prequalified by the District: C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46. Value of contract is estimated at $ 4,023,055,Section A: Holland and Wishon Elementary $1,776,035 & Section B: Del Mar and Roeding Elementary $2,247,020. Value of contract is estimated at $ 3,534,318 (consisting of Section A: $1,287,298 & Section B $2,247,020 This is an ESSER funded project to improve indoor air quality. Requests for clarification are/were due Thursday, February 9, 2023 3:00:00 PM [(UTC-08:00) Pacific Time (US & Canada)]. This Project Consists of the Replacement of One (1) Hydronic Boiler, Three (3) Hydronic Pumps, Fifteen (15) Unit Ventilators, and Eighteen (18) Wall-mount Heat Pumps. Also, Included is the Integration of All Existing Hvac Equipment Into the New Fx-80 System. Electrical and Structural Scope is Only Included as It Pertains to the Hvac Equipment.

Award

Educational

$4,780,700.00

Public - City

Renovation

143

29

53

11

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
16
Bidding Soon
412
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2023

April 24, 2023

img_map_placeholder

Multiple Locations, Fresno, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.