BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Burnaby, British Columbia. Completed plans call for site work for a bridge / tunnel.

The City of Burnaby invites submissions for the pre-qualification of Construction Managers interested in submitting a proposal for the project namely Burnaby Park Overpass project utilizing a CM at risk approach. The current project schedule estimates the Request for Proposal will be issued spring 2023. The construction period is anticipated to be approximately 12 months. The City intends to pre-qualify Construction Managers for the proposed Project. The City reserves the right, at its sole discretion to adjust the number of pre-qualified construction mangers invited to submit a proposal for the construction of this overpass. Background: The pedestrian-cyclist overpass will support multiple regional initiatives and strengthen the broader regional active transportation network. This includes improving connectivity with the Central Valley Greenway, which is part of Metro Vancouver's Regional Greenway system, and Translink's Major Bikeway Network such as the BC Parkway. The proposed project will also help bridge existing gaps in the City's active transportation network and contribute to the development of the City's Priority Cycle Network as identified in Connecting Burnaby, the City's Transportation Plan. The proposed pedestrian cyclist overpass, refer to Appendix C - Illustrative Image for reference, will improve connectivity across the regional cycling network and will support TransLinks Transport 2050, which was recently adopted and serves as the new Regional Transportation Strategy for Metro Vancouver. As part of that strategy additional cycling corridors in the city have been identified as part of TransLink's Major Bikeway, which will connect with the proposed overpass to provide improved access to both local and regional key destinations. In addition, the proposed overpass will strengthen connectivity between Metro Vancouver's existing Regional Greenways Network and the City's priority cycle network planned future cycling upgrade initiatives and expand active transportation options for both the local community and across the region as a whole. Documents can be obtained from https://burnaby.bidsandtenders.ca/ TIMELINE: Pre-Qualification of Construction Manager at Risk has closed; three (3) firms have prequalified. Invited RFP / tender to those firms may be issued spring 2023; specific timelines have yet to be confirmed. Details will be posted on Bids and Tenders website.

Post-Bid

Bridges / Tunnels

$5,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
37
Bidding Soon
1,554
All Active Projects
611
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.